How does the load test run of the transformer work?
How does the load test run of the transformer work?
When conducting a load test for transformers, the transformer can proceed to the load test phase only if there are no abnormalities during 24 hours of no-load operation. The specific operational steps are outlined below:
(1) Gradual Load Increase: Initiate the operation with a 25% load, gradually increasing it to 50%, 75%, and finally reaching full-load testing. Throughout this process, it is essential to ensure that there is no leakage of oil from the seals and weld seams.
(2) Cooling System Activation: As the transformer temperature rises during load testing, a certain number of cooling systems should be gradually activated.
(3) Test Duration: The load test duration should commence from reaching full load and last for 2 hours.
(4) Inspection under Normal Conditions: In the course of load testing, especially during full-load testing, the load test work can be concluded only when the transformer body, various components, and accessories are all confirmed to be in normal condition.
(5) Considerations for New Transformers: For newly loaded transformers, inspection frequency should be increased, with simultaneous attention to oil temperature. If the temperature exceeds 45K, an immediate signal should be issued.
Contact
LuShan, est. 1975, is a Chinese professional manufacturer specializing in power transformers and reactors for 50+ years. Leading products are single-phase transformer, three-phase isolation transformers, electrical transformer, distribution transformer, step down and step up transformer, low voltage transformer, high voltage transformer, control transformer, toroidal transformer, R-core transformer; DC inductors, AC reactors, filtering reactor, line and load reactor, chokes, filtering reactor, and intermediate, high-frequency products.
Our power transformers and reactors are widely used in 10 application areas: rapid transit, construction machinery, renewable energy, intelligent manufacturing, medical equipment, coal mine explosion prevention, excitation system, vacuum sintering(furnace), central air conditioning.
Know more about power transformer and reactor: www.lstransformer.com.
If you would like to obtain customized solutions for transformers or reactors, please contact us.
WhatsApp:+86 13787095096
Email: marketing@hnlsdz.com