{"id":1538,"date":"2026-07-22T05:33:30","date_gmt":"2026-07-22T05:33:30","guid":{"rendered":"https:\/\/lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/"},"modified":"2026-09-26T16:30:06","modified_gmt":"2026-09-26T16:30:06","slug":"how-to-conduct-a-pump-test-for-oil-immersed-transformers","status":"publish","type":"post","link":"https:\/\/www.lstransformer.com\/de\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/","title":{"rendered":"How to conduct a pump test for oil-immersed transformers?"},"content":{"rendered":"<h1 style=\"text-align: left;\">How to conduct a pump test for oil-immersed transformers?<\/h1>\n<p><a title=\"Transformer, Wholesale Transformatoren Versorgt und Hersteller,Spezialisiert in Transformatoren f\u00fcr 49 Jahre\" href=\"https:\/\/www.lstransformer.com\/de\/Transformers\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"aligncenter\" title=\"112\" src=\"https:\/\/manage.lstransformer.com\/upload\/news\/1742203597282670.jpg\" alt=\"undefined\" \/><\/a><\/p>\n<p style=\"font-weight: 400;\">Performing a pump test for oil-immersed transformers is an essential step in the production and maintenance processes. For transformers that have completed the assembly, especially those with a capacity of 8000kVA, voltage of 35kV and below, and equipped with an oil storage tank, a pump test must be carried out, as shown in Figure 87-1(a). For transformers with a capacity of 3150kVA, voltage of 60kV and above, the same method can be employed even after oil filling to ensure the quality during transportation and storage. During the pump test, the pump joint should be installed at the plug seat on top of the oil storage tank or at the dismantled box top flange, and the oil level position on the oil gauge should be recorded.<\/p>\n<p style=\"font-weight: 400;\">The procedure is as follows: Hold the windpipe with the left hand towards the pump nozzle and introduce dry compressed air; with the right hand, tighten the pressure gauge from the upper end of the pump joint, forcing a gap (i.e., opening the sealing surface) between the joint and the internal components, allowing gas to enter the pressure gauge and the inside of the oil storage tank. As the gas is injected into the tank, the oil level on the oil gauge will slowly decrease. When it drops to approximately 30-40mm, and the pressure gauge shows a pressure of 0.045MPa, rotate the pressure gauge upward to seal the internal components with the joint, completing the gas injection.<\/p>\n<p style=\"font-weight: 400;\">During the pump test, if there is a leakage of gas in the transformer, it can be observed from the oil gauge that the oil gradually returns to its position before the pump; if there is a oil leakage, the oil level will drop even lower. Within 8 hours after the pump test, the operator needs to repair the leaking oil and gas areas, and then apply pressure for an additional 4 hours (2 hours for dismantled products). Only when the pressure is not less than 0.02MPa and there is no leaking oil, the pump test is considered qualified.<\/p>\n<p style=\"font-weight: 400;\">When withdrawing the pump, the operator should use the left hand to block the valve, unscrew the sealing surface of the pressure gauge, and check that the residual pressure is not less than 0.02MPa. For the pump test method of single-casing transformers at 60kV and 110kV, refer to Figure 87-2, where the pump joint is connected to the pressure gauge, and a bicycle valve is welded to the joint for inflation using compressed air or an inflation tube.<\/p>\n<h2 style=\"font-weight: bold;\">Kontakt<\/h2>\n<p>\u96fb\u529b\u306e\u7b97\u51fa: <a href=\"https:\/\/www.lstransformer.com\/de\/\">single-phase transformer, three-phase-isolation in Transformatoren, elektrischen Transformator, Verteilung Transformator, step-down und step-up-Transformator, low-Spannung Transformator, hohe Spannung Transformator, Steuerung, Transformator, Ringkern Transformator, R-core-Transformator; DC-Spulen, AC Reaktoren, Filter-Reaktor -, line-und load reactor, drosseln, Filter-Reaktor, und die Mittel, hoch-Frequenz-Produkte<\/a>.<\/p>\n<p>\u304cV_peak\u7a4d\u306e\u904e\u96fb\u5727\u306e\u30d4\u30fc\u30af\u3068t_res\u306b\u5171\u9cf4\u3002 30%\u30de\u30fc\u30b8\u30f3\u63a8\u5968\u3092\u5360\u3081\u308b\u30b7\u30b9\u30c6\u30e0\u30d1\u30e9\u30e1\u30fc\u30bf\u5316\u3057\u307e\u3059\u3002<\/p>\n<p>2.2.3\u306e\u52d5\u7684\u5fdc\u7b54\u30bd\u30ea\u30e5\u30fc\u30b7\u30e7\u30f3 <a href=\"https:\/\/www.lstransformer.com\/de\/\">\u73fe\u4ee3\u306e\u30b7\u30b9\u30c6\u30e0\u5229\u7528\u30b5\u30a4\u30ea\u30b9\u30bf\u5236\u5fa1\u306b\u3088\u308b\u62b5\u6297\u6e1b\u8870(TCRD)\u3092\u691c\u77e5\u3059\u308b\u5171\u9cf4\u518510ms\u3001\u914d\u306e\u6b63\u78ba\u6027\u3001\u5207\u65ad\u4e2d\u306e\u901a\u5e38\u306e\u64cd\u4f5c\u306f\u907f\u3051\u307e\u3059\u3002<\/a>.<\/p>\n<p>3. \u9023\u643a\u6a5f\u69cb\u306e\u30a2\u30af\u30c6\u30a3\u30d6\u30d5\u30a3\u30eb\u30bf<br \/>\nWhatsApp\uff1a+86 13787095096<br \/>\nE-Mail: marketing@hnlsdz.com<\/p>","protected":false},"excerpt":{"rendered":"<p>How to conduct a pump test for oil-immersed transformers? Performing a pump test for oil-immersed transformers is an essential step in the production and maintenance processes. For transformers that have completed the assembly, especially those with a capacity of 8000kVA, voltage of 35kV and below, and equipped with an oil storage tank, a pump test [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1995,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-1538","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to conduct a pump test for oil-immersed transformers? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD<\/title>\n<meta name=\"description\" content=\"Performing a pump test for oil-immersed transformers is an essential step in the production and maintenance processes. For transformers that have completed the assembly, especially those with a capacity of 8000kVA, voltage of 35kV and below, and equipped with an oil storage tank, a pump test must be carried out, as shown in Figure 87-1(a). For transformers with a capacity of 3150kVA, voltage of 60kV and above, the same method can be employed even after oil filling to ensure the quality during transportation and storage. During the pump test, the pump joint should be installed at the plug seat on top of the oil storage tank or at the dismantled box top flange, and the oil level position on the oil gauge should be recorded.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lstransformer.com\/de\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/\" \/>\n<meta property=\"og:locale\" content=\"de_DE\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to conduct a pump test for oil-immersed transformers? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"og:description\" content=\"Performing a pump test for oil-immersed transformers is an essential step in the production and maintenance processes. For transformers that have completed the assembly, especially those with a capacity of 8000kVA, voltage of 35kV and below, and equipped with an oil storage tank, a pump test must be carried out, as shown in Figure 87-1(a). For transformers with a capacity of 3150kVA, voltage of 60kV and above, the same method can be employed even after oil filling to ensure the quality during transportation and storage. During the pump test, the pump joint should be installed at the plug seat on top of the oil storage tank or at the dismantled box top flange, and the oil level position on the oil gauge should be recorded.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lstransformer.com\/de\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/\" \/>\n<meta property=\"og:site_name\" content=\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T05:33:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-26T16:30:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742009382397862-1.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"370\" \/>\n\t<meta property=\"og:image:height\" content=\"276\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"369703005\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Verfasst von\" \/>\n\t<meta name=\"twitter:data1\" content=\"369703005\" \/>\n\t<meta name=\"twitter:label2\" content=\"Gesch\u00e4tzte Lesezeit\" \/>\n\t<meta name=\"twitter:data2\" content=\"4\u00a0Minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/\"},\"author\":{\"name\":\"369703005\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\"},\"headline\":\"How to conduct a pump test for oil-immersed transformers?\",\"datePublished\":\"2026-07-22T05:33:30+00:00\",\"dateModified\":\"2026-09-26T16:30:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/\"},\"wordCount\":563,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742009382397862-1.webp\",\"articleSection\":[\"FAQ\"],\"inLanguage\":\"de\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/\",\"name\":\"How to conduct a pump test for oil-immersed transformers? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742009382397862-1.webp\",\"datePublished\":\"2026-07-22T05:33:30+00:00\",\"dateModified\":\"2026-09-26T16:30:06+00:00\",\"description\":\"Performing a pump test for oil-immersed transformers is an essential step in the production and maintenance processes. For transformers that have completed the assembly, especially those with a capacity of 8000kVA, voltage of 35kV and below, and equipped with an oil storage tank, a pump test must be carried out, as shown in Figure 87-1(a). For transformers with a capacity of 3150kVA, voltage of 60kV and above, the same method can be employed even after oil filling to ensure the quality during transportation and storage. During the pump test, the pump joint should be installed at the plug seat on top of the oil storage tank or at the dismantled box top flange, and the oil level position on the oil gauge should be recorded.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/#breadcrumb\"},\"inLanguage\":\"de\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742009382397862-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742009382397862-1.webp\",\"width\":370,\"height\":276},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.lstransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to conduct a pump test for oil-immersed transformers?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lstransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"de\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"width\":760,\"height\":202,\"caption\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\",\"name\":\"369703005\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"de\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"caption\":\"369703005\"},\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/de\\\/author\\\/369703005\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to conduct a pump test for oil-immersed transformers? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"Performing a pump test for oil-immersed transformers is an essential step in the production and maintenance processes. For transformers that have completed the assembly, especially those with a capacity of 8000kVA, voltage of 35kV and below, and equipped with an oil storage tank, a pump test must be carried out, as shown in Figure 87-1(a). For transformers with a capacity of 3150kVA, voltage of 60kV and above, the same method can be employed even after oil filling to ensure the quality during transportation and storage. During the pump test, the pump joint should be installed at the plug seat on top of the oil storage tank or at the dismantled box top flange, and the oil level position on the oil gauge should be recorded.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lstransformer.com\/de\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/","og_locale":"de_DE","og_type":"article","og_title":"How to conduct a pump test for oil-immersed transformers? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","og_description":"Performing a pump test for oil-immersed transformers is an essential step in the production and maintenance processes. For transformers that have completed the assembly, especially those with a capacity of 8000kVA, voltage of 35kV and below, and equipped with an oil storage tank, a pump test must be carried out, as shown in Figure 87-1(a). For transformers with a capacity of 3150kVA, voltage of 60kV and above, the same method can be employed even after oil filling to ensure the quality during transportation and storage. During the pump test, the pump joint should be installed at the plug seat on top of the oil storage tank or at the dismantled box top flange, and the oil level position on the oil gauge should be recorded.","og_url":"https:\/\/www.lstransformer.com\/de\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/","og_site_name":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","article_published_time":"2026-07-22T05:33:30+00:00","article_modified_time":"2026-09-26T16:30:06+00:00","og_image":[{"width":370,"height":276,"url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742009382397862-1.webp","type":"image\/webp"}],"author":"369703005","twitter_card":"summary_large_image","twitter_misc":{"Verfasst von":"369703005","Gesch\u00e4tzte Lesezeit":"4\u00a0Minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/#article","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/"},"author":{"name":"369703005","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289"},"headline":"How to conduct a pump test for oil-immersed transformers?","datePublished":"2026-07-22T05:33:30+00:00","dateModified":"2026-09-26T16:30:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/"},"wordCount":563,"publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"image":{"@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742009382397862-1.webp","articleSection":["FAQ"],"inLanguage":"de"},{"@type":"WebPage","@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/","url":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/","name":"How to conduct a pump test for oil-immersed transformers? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/#primaryimage"},"image":{"@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742009382397862-1.webp","datePublished":"2026-07-22T05:33:30+00:00","dateModified":"2026-09-26T16:30:06+00:00","description":"Performing a pump test for oil-immersed transformers is an essential step in the production and maintenance processes. For transformers that have completed the assembly, especially those with a capacity of 8000kVA, voltage of 35kV and below, and equipped with an oil storage tank, a pump test must be carried out, as shown in Figure 87-1(a). For transformers with a capacity of 3150kVA, voltage of 60kV and above, the same method can be employed even after oil filling to ensure the quality during transportation and storage. During the pump test, the pump joint should be installed at the plug seat on top of the oil storage tank or at the dismantled box top flange, and the oil level position on the oil gauge should be recorded.","breadcrumb":{"@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/#breadcrumb"},"inLanguage":"de","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/"]}]},{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/#primaryimage","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742009382397862-1.webp","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742009382397862-1.webp","width":370,"height":276},{"@type":"BreadcrumbList","@id":"https:\/\/www.lstransformer.com\/how-to-conduct-a-pump-test-for-oil-immersed-transformers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.lstransformer.com\/"},{"@type":"ListItem","position":2,"name":"How to conduct a pump test for oil-immersed transformers?"}]},{"@type":"WebSite","@id":"https:\/\/www.lstransformer.com\/#website","url":"https:\/\/www.lstransformer.com\/","name":"LS power Transformator, die Linie Reaktor, Hohe-Spannung Transformator, \u00d6l-eingetaucht Transformator-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"","publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lstransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"de"},{"@type":"Organization","@id":"https:\/\/www.lstransformer.com\/#organization","name":"LS power Transformator, die Linie Reaktor, Hohe-Spannung Transformator, \u00d6l-eingetaucht Transformator-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","url":"https:\/\/www.lstransformer.com\/","logo":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","width":760,"height":202,"caption":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD"},"image":{"@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289","name":"369703005","image":{"@type":"ImageObject","inLanguage":"de","@id":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","caption":"369703005"},"url":"https:\/\/www.lstransformer.com\/de\/author\/369703005\/"}]}},"_links":{"self":[{"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/posts\/1538","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/comments?post=1538"}],"version-history":[{"count":4,"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/posts\/1538\/revisions"}],"predecessor-version":[{"id":6415,"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/posts\/1538\/revisions\/6415"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/media\/1995"}],"wp:attachment":[{"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/media?parent=1538"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/categories?post=1538"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lstransformer.com\/de\/wp-json\/wp\/v2\/tags?post=1538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}