{"id":1380,"date":"2026-07-22T05:33:18","date_gmt":"2026-07-22T05:33:18","guid":{"rendered":"https:\/\/lstransformer.com\/conditions-for-parallel-operation-of-transformers\/"},"modified":"2026-09-28T05:53:46","modified_gmt":"2026-09-28T05:53:46","slug":"conditions-for-parallel-operation-of-transformers","status":"publish","type":"post","link":"https:\/\/www.lstransformer.com\/es\/conditions-for-parallel-operation-of-transformers\/","title":{"rendered":"Conditions for Parallel Operation of Transformers"},"content":{"rendered":"<h1>Conditions for Parallel Operation of Transformers<\/h1>\n<p><a href=\"https:\/\/www.lstransformer.com\/es\/Transformers\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"aligncenter\" title=\"108\" src=\"https:\/\/manage.lstransformer.com\/upload\/news\/1742636296222217.jpg\" alt=\"indefinido\" \/><\/a><\/p>\n<p>Parallel operation of transformers is a common practice in power systems where multiple transformers are connected together to share the load. However, for transformers to operate in parallel, certain conditions must be met to ensure that the transformers operate safely and efficiently. The first condition for parallel operation is that the transformers must have the same voltage ratio and phase shift. This means that the transformers must be identical or have the same impedance ratio. Otherwise, if the transformers have different voltage ratios, the transformers may not share the load equally, and some transformers may be overloaded.<\/p>\n<p>The second condition is that the transformers must have the same phase sequence. This means that the polarity of the primary and secondary windings must be the same for all transformers. If the phase sequence is not the same, the transformers may not share the load equally, and the circulating current between the transformers may cause overheating and damage.<\/p>\n<p>The third condition is that the transformers must have the same impedance or impedance ratio. This is to ensure that the transformers share the load equally and that there is no voltage unbalance between the transformers.<\/p>\n<p>In addition to these conditions, the transformers should have the same cooling characteristics, insulation class, and impedance voltage drop. Proper protection devices and control circuits should also be installed to ensure the safety and reliability of the parallel operation. In conclusion, parallel operation of transformers can increase the power supply reliability and flexibility. However, to ensure safe and efficient operation, the transformers must meet certain conditions and requirements.<\/p>\n<p>When two or more transformers are connected in parallel, it is important to ensure that they share the load equally. This requires that the transformers be of identical rating, have the same percentage impedance, and be connected with proper phase rotation. In addition, the voltage ratios of the transformers must be the same, or else a circulating current may flow between the transformers, causing overheating and reducing efficiency. Parallel operation can be achieved by using external load tap changers, which can adjust the output voltage of each transformer to achieve equal sharing of the load. Alternatively, transformers can be designed with on-load tap changers, which allow the voltage ratio to be adjusted without interrupting the load. In either case, proper maintenance and monitoring is essential to ensure the safe and efficient operation of the parallel transformers.<\/p>\n<h2 style=\"font-weight: bold;\">Contacto<\/h2>\n<p>LuShan, est. En 1975, es un Chino fabricante profesional que se especializa en los transformadores de potencia y reactores de m\u00e1s de 50 a\u00f1os. Los productos principales son <a href=\"https:\/\/www.lstransformer.com\/es\/\">transformador monof\u00e1sico, trif\u00e1sico de transformadores de aislamiento, transformador el\u00e9ctrico, transformador de distribuci\u00f3n, el paso hacia abajo y paso transformador de baja tensi\u00f3n del transformador, transformador de alto voltaje, transformador de control, transformador toroidal, R-transformador con n\u00facleo; DC inductores, CA reactores, filtrado de reactor de l\u00ednea y de carga del reactor, estrangulaciones, el filtrado de los reactores y de los intermedios, de alta frecuencia de los productos<\/a>.<\/p>\n<p>Nuestros transformadores de potencia y reactores son ampliamente utilizados en las 10 \u00e1reas de aplicaci\u00f3n: rapid transit, maquinaria de construcci\u00f3n, energ\u00eda renovable, de fabricaci\u00f3n inteligentes, equipos m\u00e9dicos, la mina de carb\u00f3n de la explosi\u00f3n de la prevenci\u00f3n, el sistema de excitaci\u00f3n, de vac\u00edo, de sinterizaci\u00f3n(horno), aire acondicionado central.<\/p>\n<p>Saber m\u00e1s acerca de transformadores de potencia y reactores: <a href=\"https:\/\/www.lstransformer.com\/es\/\">www.lstransformer.com<\/a>.<\/p>\n<p>Si desea obtener soluciones personalizadas para transformadores o reactores, p\u00f3ngase en contacto con nosotros.<br \/>\nWhatsApp\uff1a+86 13787095096<br \/>\nCorreo electr\u00f3nico: marketing@hnlsdz.com<\/p>","protected":false},"excerpt":{"rendered":"<p>Conditions for Parallel Operation of Transformers Parallel operation of transformers is a common practice in power systems where multiple transformers are connected together to share the load. However, for transformers to operate in parallel, certain conditions must be met to ensure that the transformers operate safely and efficiently. The first condition for parallel operation is [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2542,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-1380","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Conditions for Parallel Operation of Transformers - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD<\/title>\n<meta name=\"description\" content=\"Parallel operation of transformers is a common practice in power systems where multiple transformers are connected together to share the load. However, for transformers to operate in parallel, certain conditions must be met to ensure that the transformers operate safely and efficiently. The first condition for parallel operation is that the transformers must have the same voltage ratio and phase shift. This means that the transformers must be identical or have the same impedance ratio. Otherwise, if the transformers have different voltage ratios, the transformers may not share the load equally, and some transformers may be overloaded.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lstransformer.com\/es\/conditions-for-parallel-operation-of-transformers\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Conditions for Parallel Operation of Transformers - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"og:description\" content=\"Parallel operation of transformers is a common practice in power systems where multiple transformers are connected together to share the load. However, for transformers to operate in parallel, certain conditions must be met to ensure that the transformers operate safely and efficiently. The first condition for parallel operation is that the transformers must have the same voltage ratio and phase shift. This means that the transformers must be identical or have the same impedance ratio. Otherwise, if the transformers have different voltage ratios, the transformers may not share the load equally, and some transformers may be overloaded.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lstransformer.com\/es\/conditions-for-parallel-operation-of-transformers\/\" \/>\n<meta property=\"og:site_name\" content=\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T05:33:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-28T05:53:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742178260329796.png\" \/>\n\t<meta property=\"og:image:width\" content=\"370\" \/>\n\t<meta property=\"og:image:height\" content=\"276\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"369703005\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"369703005\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/\"},\"author\":{\"name\":\"369703005\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\"},\"headline\":\"Conditions for Parallel Operation of Transformers\",\"datePublished\":\"2026-07-22T05:33:18+00:00\",\"dateModified\":\"2026-09-28T05:53:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/\"},\"wordCount\":534,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742178260329796.png\",\"articleSection\":[\"FAQ\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/\",\"name\":\"Conditions for Parallel Operation of Transformers - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742178260329796.png\",\"datePublished\":\"2026-07-22T05:33:18+00:00\",\"dateModified\":\"2026-09-28T05:53:46+00:00\",\"description\":\"Parallel operation of transformers is a common practice in power systems where multiple transformers are connected together to share the load. However, for transformers to operate in parallel, certain conditions must be met to ensure that the transformers operate safely and efficiently. The first condition for parallel operation is that the transformers must have the same voltage ratio and phase shift. This means that the transformers must be identical or have the same impedance ratio. Otherwise, if the transformers have different voltage ratios, the transformers may not share the load equally, and some transformers may be overloaded.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742178260329796.png\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742178260329796.png\",\"width\":370,\"height\":276},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/conditions-for-parallel-operation-of-transformers\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.lstransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Conditions for Parallel Operation of Transformers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lstransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"width\":760,\"height\":202,\"caption\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\",\"name\":\"369703005\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"caption\":\"369703005\"},\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/es\\\/author\\\/369703005\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Conditions for Parallel Operation of Transformers - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"Parallel operation of transformers is a common practice in power systems where multiple transformers are connected together to share the load. However, for transformers to operate in parallel, certain conditions must be met to ensure that the transformers operate safely and efficiently. The first condition for parallel operation is that the transformers must have the same voltage ratio and phase shift. This means that the transformers must be identical or have the same impedance ratio. Otherwise, if the transformers have different voltage ratios, the transformers may not share the load equally, and some transformers may be overloaded.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lstransformer.com\/es\/conditions-for-parallel-operation-of-transformers\/","og_locale":"es_ES","og_type":"article","og_title":"Conditions for Parallel Operation of Transformers - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","og_description":"Parallel operation of transformers is a common practice in power systems where multiple transformers are connected together to share the load. However, for transformers to operate in parallel, certain conditions must be met to ensure that the transformers operate safely and efficiently. The first condition for parallel operation is that the transformers must have the same voltage ratio and phase shift. This means that the transformers must be identical or have the same impedance ratio. Otherwise, if the transformers have different voltage ratios, the transformers may not share the load equally, and some transformers may be overloaded.","og_url":"https:\/\/www.lstransformer.com\/es\/conditions-for-parallel-operation-of-transformers\/","og_site_name":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","article_published_time":"2026-07-22T05:33:18+00:00","article_modified_time":"2026-09-28T05:53:46+00:00","og_image":[{"width":370,"height":276,"url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742178260329796.png","type":"image\/png"}],"author":"369703005","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"369703005","Tiempo de lectura":"4 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/#article","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/"},"author":{"name":"369703005","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289"},"headline":"Conditions for Parallel Operation of Transformers","datePublished":"2026-07-22T05:33:18+00:00","dateModified":"2026-09-28T05:53:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/"},"wordCount":534,"publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"image":{"@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742178260329796.png","articleSection":["FAQ"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/","url":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/","name":"Conditions for Parallel Operation of Transformers - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/#primaryimage"},"image":{"@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742178260329796.png","datePublished":"2026-07-22T05:33:18+00:00","dateModified":"2026-09-28T05:53:46+00:00","description":"Parallel operation of transformers is a common practice in power systems where multiple transformers are connected together to share the load. However, for transformers to operate in parallel, certain conditions must be met to ensure that the transformers operate safely and efficiently. The first condition for parallel operation is that the transformers must have the same voltage ratio and phase shift. This means that the transformers must be identical or have the same impedance ratio. Otherwise, if the transformers have different voltage ratios, the transformers may not share the load equally, and some transformers may be overloaded.","breadcrumb":{"@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/#primaryimage","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742178260329796.png","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742178260329796.png","width":370,"height":276},{"@type":"BreadcrumbList","@id":"https:\/\/www.lstransformer.com\/conditions-for-parallel-operation-of-transformers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.lstransformer.com\/"},{"@type":"ListItem","position":2,"name":"Conditions for Parallel Operation of Transformers"}]},{"@type":"WebSite","@id":"https:\/\/www.lstransformer.com\/#website","url":"https:\/\/www.lstransformer.com\/","name":"LS transformador de potencia, reactor de L\u00ednea de Alta tensi\u00f3n del transformador, el Aceite de transformador inmerso-CHANGSHA LUSHAN TECNOLOG\u00cdA ELECTR\u00d3NICA CO.,LTD","description":"","publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lstransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.lstransformer.com\/#organization","name":"LS transformador de potencia, reactor de L\u00ednea de Alta tensi\u00f3n del transformador, el Aceite de transformador inmerso-CHANGSHA LUSHAN TECNOLOG\u00cdA ELECTR\u00d3NICA CO.,LTD","url":"https:\/\/www.lstransformer.com\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","width":760,"height":202,"caption":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD"},"image":{"@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289","name":"369703005","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","caption":"369703005"},"url":"https:\/\/www.lstransformer.com\/es\/author\/369703005\/"}]}},"_links":{"self":[{"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/posts\/1380","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/comments?post=1380"}],"version-history":[{"count":5,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/posts\/1380\/revisions"}],"predecessor-version":[{"id":6853,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/posts\/1380\/revisions\/6853"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/media\/2542"}],"wp:attachment":[{"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/media?parent=1380"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/categories?post=1380"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/tags?post=1380"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}