{"id":1469,"date":"2026-07-22T05:33:25","date_gmt":"2026-07-22T05:33:25","guid":{"rendered":"https:\/\/lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/"},"modified":"2026-09-27T06:17:31","modified_gmt":"2026-09-27T06:17:31","slug":"what-should-be-noted-when-assembling-the-transformer-winding-2","status":"publish","type":"post","link":"https:\/\/www.lstransformer.com\/es\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","title":{"rendered":"What should be noted when assembling the transformer winding? (2)"},"content":{"rendered":"<h1 style=\"text-align: left;\">What should be noted when assembling the transformer winding? (2)<\/h1>\n<p>In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.<\/p>\n<h2><strong>Contenido<\/strong><b><\/b><\/h2>\n<h3><em>1. Symmetry and alignment in the height direction<\/em><\/h3>\n<h6 style=\"padding-left: 40px;\"><strong>(1) Height difference and reasons of high-voltage and low-voltage windings:<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">\u00a0Winding assembly needs to maintain symmetry in the height direction. Due to the high voltage to ground, the high-voltage winding has a large insulation distance and is generally shorter than the low-voltage winding. Moreover, due to manufacturing tolerances, there are tolerances in the heights of high-voltage and low-voltage windings. These factors need to be considered during assembly.<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(2) Importance of geometric center alignment:<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Ensuring the alignment of the geometric centers of high-voltage and low-voltage windings is of crucial importance. Misalignment will increase the axial electromagnetic force, leading to a further expansion of the height difference, affecting the overall structural stability and performance of the transformer. For example, it may cause winding loosening and deformation, affect electromagnetic coupling, increase losses, and even cause local overheating.<\/p>\n<p><a title=\"Distribuidor, Mayorista de Transformadores de Suministros y los Fabricantes,que se Especializa en los Transformadores de 49 a\u00f1os\" href=\"https:\/\/www.lstransformer.com\/es\/Transformers\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-family: Calibri Light;\"><img decoding=\"async\" class=\"aligncenter\" title=\"56\" src=\"https:\/\/manage.lstransformer.com\/upload\/news\/1741946589389040.jpg\" alt=\"indefinido\" \/><\/span><\/a><\/p>\n<h3><em>2. Core protection and optimization of assembly method during the assembly process<\/em><\/h3>\n<h6 style=\"padding-left: 40px;\"><strong>(1) Protective measures for the upper end of the core:<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">When assembling windings on the iron core bound with glass adhesive tape, the upper end of the core column should be clamped and tied firmly in advance with clamps and straps to prevent the iron core sheets from toppling and causing the adhesive tape to crack, thus destroying the integrity and insulation performance of the core and affecting the operation of the transformer.<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(2) Advantages of overall combined assembly:\u00a0<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">For winding assembly, it is advisable to assemble the windings together first and then assemble them as a whole on the iron core column. This can speed up the assembly speed of the transformer body, improve production efficiency, and at the same time reduce the possibility of moisture absorption and ensure insulation performance and operational reliability.<\/p>\n<p><a title=\"Distribuidor, Mayorista de Transformadores de Suministros y los Fabricantes,que se Especializa en los Transformadores de 49 a\u00f1os\" href=\"https:\/\/www.lstransformer.com\/es\/Transformers\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"aligncenter\" title=\"57\" src=\"https:\/\/manage.lstransformer.com\/upload\/news\/1741946616316829.jpg\" alt=\"indefinido\" \/><\/a><\/p>\n<h2><strong>En Resumen<\/strong><\/h2>\n<p>In short, during the transformer winding assembly process, points such as winding direction, misalignment control, height alignment, iron core protection, and assembly method all need to be strictly controlled. Operators must have a high sense of responsibility and professional skills to ensure that each link is accurate and error-free to guarantee the quality and performance of the transformer and provide strong support for the stable operation of the power system. Any negligence may cause serious problems and must be taken seriously.<\/p>\n<h2 style=\"font-weight: bold;\">Contacto<\/h2>\n<p>LuShan, est. En 1975, es un Chino fabricante profesional que se especializa en los transformadores de potencia y reactores de m\u00e1s de 50 a\u00f1os. Los productos principales son <a href=\"https:\/\/www.lstransformer.com\/es\/\">transformador monof\u00e1sico, trif\u00e1sico de transformadores de aislamiento, transformador el\u00e9ctrico, transformador de distribuci\u00f3n, el paso hacia abajo y paso transformador de baja tensi\u00f3n del transformador, transformador de alto voltaje, transformador de control, transformador toroidal, R-transformador con n\u00facleo; DC inductores, CA reactores, filtrado de reactor de l\u00ednea y de carga del reactor, estrangulaciones, el filtrado de los reactores y de los intermedios, de alta frecuencia de los productos<\/a>.<\/p>\n<p>Nuestros transformadores de potencia y reactores son ampliamente utilizados en las 10 \u00e1reas de aplicaci\u00f3n: rapid transit, maquinaria de construcci\u00f3n, energ\u00eda renovable, de fabricaci\u00f3n inteligentes, equipos m\u00e9dicos, la mina de carb\u00f3n de la explosi\u00f3n de la prevenci\u00f3n, el sistema de excitaci\u00f3n, de vac\u00edo, de sinterizaci\u00f3n(horno), aire acondicionado central.<\/p>\n<p>Saber m\u00e1s acerca de transformadores de potencia y reactores: <a href=\"https:\/\/www.lstransformer.com\/es\/\">www.lstransformer.com<\/a>.<\/p>\n<p>Si desea obtener soluciones personalizadas para transformadores o reactores, p\u00f3ngase en contacto con nosotros.<br \/>\nWhatsApp\uff1a+86 13787095096<br \/>\nCorreo electr\u00f3nico: marketing@hnlsdz.com<\/p>","protected":false},"excerpt":{"rendered":"<p>What should be noted when assembling the transformer winding? (2) In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process. Content 1. Symmetry and alignment in the height direction (1) [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2184,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-1469","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD<\/title>\n<meta name=\"description\" content=\"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lstransformer.com\/es\/what-should-be-noted-when-assembling-the-transformer-winding-2\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"og:description\" content=\"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lstransformer.com\/es\/what-should-be-noted-when-assembling-the-transformer-winding-2\/\" \/>\n<meta property=\"og:site_name\" content=\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T05:33:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-27T06:17:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png\" \/>\n\t<meta property=\"og:image:width\" content=\"370\" \/>\n\t<meta property=\"og:image:height\" content=\"276\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"369703005\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"369703005\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\"},\"author\":{\"name\":\"369703005\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\"},\"headline\":\"What should be noted when assembling the transformer winding? (2)\",\"datePublished\":\"2026-07-22T05:33:25+00:00\",\"dateModified\":\"2026-09-27T06:17:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\"},\"wordCount\":546,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672245224397.png\",\"articleSection\":[\"FAQ\"],\"inLanguage\":\"es\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\",\"name\":\"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672245224397.png\",\"datePublished\":\"2026-07-22T05:33:25+00:00\",\"dateModified\":\"2026-09-27T06:17:31+00:00\",\"description\":\"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672245224397.png\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672245224397.png\",\"width\":370,\"height\":276},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.lstransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What should be noted when assembling the transformer winding? (2)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lstransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"width\":760,\"height\":202,\"caption\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\",\"name\":\"369703005\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"caption\":\"369703005\"},\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/es\\\/author\\\/369703005\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lstransformer.com\/es\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","og_locale":"es_ES","og_type":"article","og_title":"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","og_description":"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.","og_url":"https:\/\/www.lstransformer.com\/es\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","og_site_name":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","article_published_time":"2026-07-22T05:33:25+00:00","article_modified_time":"2026-09-27T06:17:31+00:00","og_image":[{"width":370,"height":276,"url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","type":"image\/png"}],"author":"369703005","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"369703005","Tiempo de lectura":"4 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#article","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/"},"author":{"name":"369703005","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289"},"headline":"What should be noted when assembling the transformer winding? (2)","datePublished":"2026-07-22T05:33:25+00:00","dateModified":"2026-09-27T06:17:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/"},"wordCount":546,"publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"image":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","articleSection":["FAQ"],"inLanguage":"es"},{"@type":"WebPage","@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","url":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","name":"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#primaryimage"},"image":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","datePublished":"2026-07-22T05:33:25+00:00","dateModified":"2026-09-27T06:17:31+00:00","description":"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.","breadcrumb":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#primaryimage","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","width":370,"height":276},{"@type":"BreadcrumbList","@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.lstransformer.com\/"},{"@type":"ListItem","position":2,"name":"What should be noted when assembling the transformer winding? (2)"}]},{"@type":"WebSite","@id":"https:\/\/www.lstransformer.com\/#website","url":"https:\/\/www.lstransformer.com\/","name":"LS transformador de potencia, reactor de L\u00ednea de Alta tensi\u00f3n del transformador, el Aceite de transformador inmerso-CHANGSHA LUSHAN TECNOLOG\u00cdA ELECTR\u00d3NICA CO.,LTD","description":"","publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lstransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.lstransformer.com\/#organization","name":"LS transformador de potencia, reactor de L\u00ednea de Alta tensi\u00f3n del transformador, el Aceite de transformador inmerso-CHANGSHA LUSHAN TECNOLOG\u00cdA ELECTR\u00d3NICA CO.,LTD","url":"https:\/\/www.lstransformer.com\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","width":760,"height":202,"caption":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD"},"image":{"@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289","name":"369703005","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","caption":"369703005"},"url":"https:\/\/www.lstransformer.com\/es\/author\/369703005\/"}]}},"_links":{"self":[{"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/posts\/1469","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/comments?post=1469"}],"version-history":[{"count":6,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/posts\/1469\/revisions"}],"predecessor-version":[{"id":6537,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/posts\/1469\/revisions\/6537"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/media\/2184"}],"wp:attachment":[{"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/media?parent=1469"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/categories?post=1469"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lstransformer.com\/es\/wp-json\/wp\/v2\/tags?post=1469"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}