{"id":1308,"date":"2026-07-22T05:33:10","date_gmt":"2026-07-22T05:33:10","guid":{"rendered":"https:\/\/lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/"},"modified":"2026-09-30T03:03:28","modified_gmt":"2026-09-30T03:03:28","slug":"how-should-an-overloaded-transformer-in-operation-be-handled","status":"publish","type":"post","link":"https:\/\/www.lstransformer.com\/fr\/how-should-an-overloaded-transformer-in-operation-be-handled\/","title":{"rendered":"How should an overloaded transformer in operation be handled?"},"content":{"rendered":"<h1 style=\"text-align: left;\">How should an overloaded transformer in operation be handled?<\/h1>\n<p>When an operating transformer experiences overload, it may manifest as the current exceeding the steady-state value, signaling, and alarm bells sounding, among other indicators. Operators should take appropriate steps based on the following principles:<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(1)<\/span> <\/strong>Check whether the current on each side exceeds the specified value and report to the duty officer.<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(2)<\/span><\/strong> Inspect the oil level and oil temperature of the transformer, and simultaneously activate all cooling devices.<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(3)<\/span> <\/strong>Adjust the operating mode promptly; if a spare transformer is available, put it into operation.<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(4)<\/span><\/strong> Contact dispatch to promptly adjust the load distribution.<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(5)<\/span><\/strong> If it is a normal overload, determine the allowable operating time based on the overload multiple and enhance monitoring of oil level and temperature, ensuring they do not exceed specified limits. If the specified time is exceeded, reduce the load immediately.<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(6)<\/span><\/strong> In the case of an accident overload, follow the manufacturer&#8217;s regulations regarding the allowable multiple and duration for overload. If the overload multiple and duration exceed specified limits, reduce the load on the transformer according to regulations.<\/p>\n<h2 style=\"font-weight: bold;\">Contact<\/h2>\n<p>LuShan, heure de l'est. 1975, est un fabricant professionnel Chinois sp\u00e9cialis\u00e9 dans les transformateurs de puissance et des r\u00e9acteurs de plus de 50 ans. Les produits de pointe sont <a href=\"https:\/\/www.lstransformer.com\/fr\/\">transformateur monophas\u00e9, triphas\u00e9 transformateurs d'isolement, transformateur \u00e9lectrique, transformateur de distribution, l'\u00e9tape vers le bas et d'intensifier le transformateur de basse tension du transformateur, transformateur \u00e0 haute tension, contr\u00f4le de transformateur toro\u00efdal transformateur, transformateur R-core; inductances DC, AC r\u00e9acteurs, le filtrage du r\u00e9acteur, de ligne et de charge du r\u00e9acteur, des bobines, le filtrage du r\u00e9acteur, et interm\u00e9diaire, \u00e0 haute fr\u00e9quence produits<\/a>.<\/p>\n<p>Nos transformateurs de puissance et les r\u00e9acteurs sont largement utilis\u00e9s dans les 10 domaines d'application: transport en commun rapide, les machines de construction, les \u00e9nergies renouvelables, intelligents de fabrication, des \u00e9quipements m\u00e9dicaux, de la mine de charbon de l'explosion de la pr\u00e9vention, de l'excitation du syst\u00e8me, frittage sous vide(four), d'une climatisation centrale.<\/p>\n<p>En savoir plus sur transformateur de puissance et le r\u00e9acteur: <a href=\"https:\/\/www.lstransformer.com\/fr\/\">www.lstransformer.com<\/a>.<\/p>\n<p>Si vous souhaitez obtenir des solutions personnalis\u00e9es pour les transformateurs ou des r\u00e9acteurs, veuillez nous contacter.<br \/>\nWhatsApp\uff1a+86 13787095096<br \/>\nE-mail: marketing@hnlsdz.com<\/p>","protected":false},"excerpt":{"rendered":"<p>How should an overloaded transformer in operation be handled? When an operating transformer experiences overload, it may manifest as the current exceeding the steady-state value, signaling, and alarm bells sounding, among other indicators. Operators should take appropriate steps based on the following principles: (1) Check whether the current on each side exceeds the specified value [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4176,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-1308","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How should an overloaded transformer in operation be handled? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD<\/title>\n<meta name=\"description\" content=\"When an operating transformer experiences overload, it may manifest as the current exceeding the steady-state value, signaling, and alarm bells sounding, among other indicators. Operators should take appropriate steps based on the following principles:\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lstransformer.com\/fr\/how-should-an-overloaded-transformer-in-operation-be-handled\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How should an overloaded transformer in operation be handled? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"og:description\" content=\"When an operating transformer experiences overload, it may manifest as the current exceeding the steady-state value, signaling, and alarm bells sounding, among other indicators. Operators should take appropriate steps based on the following principles:\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lstransformer.com\/fr\/how-should-an-overloaded-transformer-in-operation-be-handled\/\" \/>\n<meta property=\"og:site_name\" content=\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T05:33:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-30T03:03:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742019166903383.png\" \/>\n\t<meta property=\"og:image:width\" content=\"370\" \/>\n\t<meta property=\"og:image:height\" content=\"276\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"369703005\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"369703005\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/\"},\"author\":{\"name\":\"369703005\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\"},\"headline\":\"How should an overloaded transformer in operation be handled?\",\"datePublished\":\"2026-07-22T05:33:10+00:00\",\"dateModified\":\"2026-09-30T03:03:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/\"},\"wordCount\":313,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742019166903383.png\",\"articleSection\":[\"FAQ\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/\",\"name\":\"How should an overloaded transformer in operation be handled? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742019166903383.png\",\"datePublished\":\"2026-07-22T05:33:10+00:00\",\"dateModified\":\"2026-09-30T03:03:28+00:00\",\"description\":\"When an operating transformer experiences overload, it may manifest as the current exceeding the steady-state value, signaling, and alarm bells sounding, among other indicators. Operators should take appropriate steps based on the following principles:\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742019166903383.png\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742019166903383.png\",\"width\":370,\"height\":276},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-should-an-overloaded-transformer-in-operation-be-handled\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.lstransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How should an overloaded transformer in operation be handled?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lstransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"width\":760,\"height\":202,\"caption\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\",\"name\":\"369703005\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"caption\":\"369703005\"},\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/fr\\\/author\\\/369703005\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How should an overloaded transformer in operation be handled? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"When an operating transformer experiences overload, it may manifest as the current exceeding the steady-state value, signaling, and alarm bells sounding, among other indicators. Operators should take appropriate steps based on the following principles:","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lstransformer.com\/fr\/how-should-an-overloaded-transformer-in-operation-be-handled\/","og_locale":"fr_FR","og_type":"article","og_title":"How should an overloaded transformer in operation be handled? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","og_description":"When an operating transformer experiences overload, it may manifest as the current exceeding the steady-state value, signaling, and alarm bells sounding, among other indicators. Operators should take appropriate steps based on the following principles:","og_url":"https:\/\/www.lstransformer.com\/fr\/how-should-an-overloaded-transformer-in-operation-be-handled\/","og_site_name":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","article_published_time":"2026-07-22T05:33:10+00:00","article_modified_time":"2026-09-30T03:03:28+00:00","og_image":[{"width":370,"height":276,"url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742019166903383.png","type":"image\/png"}],"author":"369703005","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"369703005","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/#article","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/"},"author":{"name":"369703005","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289"},"headline":"How should an overloaded transformer in operation be handled?","datePublished":"2026-07-22T05:33:10+00:00","dateModified":"2026-09-30T03:03:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/"},"wordCount":313,"commentCount":0,"publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"image":{"@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742019166903383.png","articleSection":["FAQ"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/","url":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/","name":"How should an overloaded transformer in operation be handled? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/#primaryimage"},"image":{"@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742019166903383.png","datePublished":"2026-07-22T05:33:10+00:00","dateModified":"2026-09-30T03:03:28+00:00","description":"When an operating transformer experiences overload, it may manifest as the current exceeding the steady-state value, signaling, and alarm bells sounding, among other indicators. Operators should take appropriate steps based on the following principles:","breadcrumb":{"@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/#primaryimage","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742019166903383.png","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742019166903383.png","width":370,"height":276},{"@type":"BreadcrumbList","@id":"https:\/\/www.lstransformer.com\/how-should-an-overloaded-transformer-in-operation-be-handled\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.lstransformer.com\/"},{"@type":"ListItem","position":2,"name":"How should an overloaded transformer in operation be handled?"}]},{"@type":"WebSite","@id":"https:\/\/www.lstransformer.com\/#website","url":"https:\/\/www.lstransformer.com\/","name":"LS transformateur de puissance, r\u00e9acteur de Ligne \u00e0 Haute tension transformateur d'Huile de transformateur immerg\u00e9-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"","publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lstransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.lstransformer.com\/#organization","name":"LS transformateur de puissance, r\u00e9acteur de Ligne \u00e0 Haute tension transformateur d'Huile de transformateur immerg\u00e9-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","url":"https:\/\/www.lstransformer.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","width":760,"height":202,"caption":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD"},"image":{"@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289","name":"369703005","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","caption":"369703005"},"url":"https:\/\/www.lstransformer.com\/fr\/author\/369703005\/"}]}},"_links":{"self":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/comments?post=1308"}],"version-history":[{"count":4,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1308\/revisions"}],"predecessor-version":[{"id":7110,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1308\/revisions\/7110"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/media\/4176"}],"wp:attachment":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/media?parent=1308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/categories?post=1308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/tags?post=1308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}