{"id":1326,"date":"2026-07-22T05:33:12","date_gmt":"2026-07-22T05:33:12","guid":{"rendered":"https:\/\/lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/"},"modified":"2026-09-30T02:34:51","modified_gmt":"2026-09-30T02:34:51","slug":"how-does-the-load-test-run-of-the-transformer-work","status":"publish","type":"post","link":"https:\/\/www.lstransformer.com\/fr\/how-does-the-load-test-run-of-the-transformer-work\/","title":{"rendered":"How does the load test run of the transformer work?"},"content":{"rendered":"<h1 style=\"text-align: left;\">How does the load test run of the transformer work?<\/h1>\n<p style=\"font-weight: 400;\">When conducting a load test for transformers, the transformer can proceed to the load test phase only if there are no abnormalities during 24 hours of no-load operation. The specific operational steps are outlined below:<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(1)<\/span> <\/strong>Gradual Load Increase: Initiate the operation with a 25% load, gradually increasing it to 50%, 75%, and finally reaching full-load testing. Throughout this process, it is essential to ensure that there is no leakage of oil from the seals and weld seams.<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(2)<\/span> <\/strong>Cooling System Activation: As the transformer temperature rises during load testing, a certain number of cooling systems should be gradually activated.<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(3)<\/span><\/strong> Test Duration: The load test duration should commence from reaching full load and last for 2 hours.<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(4)<\/span> <\/strong>Inspection under Normal Conditions: In the course of load testing, especially during full-load testing, the load test work can be concluded only when the transformer body, various components, and accessories are all confirmed to be in normal condition.<\/p>\n<p style=\"padding-left: 40px;\"><strong><span style=\"color: #4874cb;\">(5)<\/span> <\/strong>Considerations for New Transformers: For newly loaded transformers, inspection frequency should be increased, with simultaneous attention to oil temperature. If the temperature exceeds 45K, an immediate signal should be issued.<\/p>\n<h2 style=\"font-weight: bold;\"><strong>Contact<\/strong><\/h2>\n<p>LuShan, heure de l'est. 1975, est un fabricant professionnel Chinois sp\u00e9cialis\u00e9 dans les transformateurs de puissance et des r\u00e9acteurs de plus de 50 ans. Les produits de pointe sont <a href=\"https:\/\/www.lstransformer.com\/fr\/\">transformateur monophas\u00e9, triphas\u00e9 transformateurs d'isolement, transformateur \u00e9lectrique, transformateur de distribution, l'\u00e9tape vers le bas et d'intensifier le transformateur de basse tension du transformateur, transformateur \u00e0 haute tension, contr\u00f4le de transformateur toro\u00efdal transformateur, transformateur R-core; inductances DC, AC r\u00e9acteurs, le filtrage du r\u00e9acteur, de ligne et de charge du r\u00e9acteur, des bobines, le filtrage du r\u00e9acteur, et interm\u00e9diaire, \u00e0 haute fr\u00e9quence produits<\/a>.<\/p>\n<p>Nos transformateurs de puissance et les r\u00e9acteurs sont largement utilis\u00e9s dans les 10 domaines d'application: transport en commun rapide, les machines de construction, les \u00e9nergies renouvelables, intelligents de fabrication, des \u00e9quipements m\u00e9dicaux, de la mine de charbon de l'explosion de la pr\u00e9vention, de l'excitation du syst\u00e8me, frittage sous vide(four), d'une climatisation centrale.<\/p>\n<p>En savoir plus sur transformateur de puissance et le r\u00e9acteur: <a href=\"https:\/\/www.lstransformer.com\/fr\/\">www.lstransformer.com<\/a>.<\/p>\n<p>Si vous souhaitez obtenir des solutions personnalis\u00e9es pour les transformateurs ou des r\u00e9acteurs, veuillez nous contacter.<br \/>\nWhatsApp\uff1a+86 13787095096<br \/>\nE-mail: marketing@hnlsdz.com<\/p>","protected":false},"excerpt":{"rendered":"<p>How does the load test run of the transformer work? When conducting a load test for transformers, the transformer can proceed to the load test phase only if there are no abnormalities during 24 hours of no-load operation. The specific operational steps are outlined below: (1) Gradual Load Increase: Initiate the operation with a 25% [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":4185,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-1326","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How does the load test run of the transformer work? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD<\/title>\n<meta name=\"description\" content=\"When conducting a load test for transformers, the transformer can proceed to the load test phase only if there are no abnormalities during 24 hours of no-load operation. The specific operational steps are outlined below:\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lstransformer.com\/fr\/how-does-the-load-test-run-of-the-transformer-work\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How does the load test run of the transformer work? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"og:description\" content=\"When conducting a load test for transformers, the transformer can proceed to the load test phase only if there are no abnormalities during 24 hours of no-load operation. The specific operational steps are outlined below:\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lstransformer.com\/fr\/how-does-the-load-test-run-of-the-transformer-work\/\" \/>\n<meta property=\"og:site_name\" content=\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T05:33:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-30T02:34:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742020715533347.png\" \/>\n\t<meta property=\"og:image:width\" content=\"370\" \/>\n\t<meta property=\"og:image:height\" content=\"276\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"369703005\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"369703005\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/\"},\"author\":{\"name\":\"369703005\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\"},\"headline\":\"How does the load test run of the transformer work?\",\"datePublished\":\"2026-07-22T05:33:12+00:00\",\"dateModified\":\"2026-09-30T02:34:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/\"},\"wordCount\":324,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742020715533347.png\",\"articleSection\":[\"FAQ\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/\",\"name\":\"How does the load test run of the transformer work? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742020715533347.png\",\"datePublished\":\"2026-07-22T05:33:12+00:00\",\"dateModified\":\"2026-09-30T02:34:51+00:00\",\"description\":\"When conducting a load test for transformers, the transformer can proceed to the load test phase only if there are no abnormalities during 24 hours of no-load operation. The specific operational steps are outlined below:\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742020715533347.png\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1742020715533347.png\",\"width\":370,\"height\":276},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/how-does-the-load-test-run-of-the-transformer-work\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.lstransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How does the load test run of the transformer work?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lstransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"width\":760,\"height\":202,\"caption\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\",\"name\":\"369703005\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"caption\":\"369703005\"},\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/fr\\\/author\\\/369703005\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How does the load test run of the transformer work? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"When conducting a load test for transformers, the transformer can proceed to the load test phase only if there are no abnormalities during 24 hours of no-load operation. The specific operational steps are outlined below:","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lstransformer.com\/fr\/how-does-the-load-test-run-of-the-transformer-work\/","og_locale":"fr_FR","og_type":"article","og_title":"How does the load test run of the transformer work? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","og_description":"When conducting a load test for transformers, the transformer can proceed to the load test phase only if there are no abnormalities during 24 hours of no-load operation. The specific operational steps are outlined below:","og_url":"https:\/\/www.lstransformer.com\/fr\/how-does-the-load-test-run-of-the-transformer-work\/","og_site_name":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","article_published_time":"2026-07-22T05:33:12+00:00","article_modified_time":"2026-09-30T02:34:51+00:00","og_image":[{"width":370,"height":276,"url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742020715533347.png","type":"image\/png"}],"author":"369703005","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"369703005","Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/#article","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/"},"author":{"name":"369703005","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289"},"headline":"How does the load test run of the transformer work?","datePublished":"2026-07-22T05:33:12+00:00","dateModified":"2026-09-30T02:34:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/"},"wordCount":324,"commentCount":0,"publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"image":{"@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742020715533347.png","articleSection":["FAQ"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/","url":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/","name":"How does the load test run of the transformer work? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/#primaryimage"},"image":{"@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742020715533347.png","datePublished":"2026-07-22T05:33:12+00:00","dateModified":"2026-09-30T02:34:51+00:00","description":"When conducting a load test for transformers, the transformer can proceed to the load test phase only if there are no abnormalities during 24 hours of no-load operation. The specific operational steps are outlined below:","breadcrumb":{"@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/#primaryimage","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742020715533347.png","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1742020715533347.png","width":370,"height":276},{"@type":"BreadcrumbList","@id":"https:\/\/www.lstransformer.com\/how-does-the-load-test-run-of-the-transformer-work\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.lstransformer.com\/"},{"@type":"ListItem","position":2,"name":"How does the load test run of the transformer work?"}]},{"@type":"WebSite","@id":"https:\/\/www.lstransformer.com\/#website","url":"https:\/\/www.lstransformer.com\/","name":"LS transformateur de puissance, r\u00e9acteur de Ligne \u00e0 Haute tension transformateur d'Huile de transformateur immerg\u00e9-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"","publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lstransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.lstransformer.com\/#organization","name":"LS transformateur de puissance, r\u00e9acteur de Ligne \u00e0 Haute tension transformateur d'Huile de transformateur immerg\u00e9-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","url":"https:\/\/www.lstransformer.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","width":760,"height":202,"caption":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD"},"image":{"@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289","name":"369703005","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","caption":"369703005"},"url":"https:\/\/www.lstransformer.com\/fr\/author\/369703005\/"}]}},"_links":{"self":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1326","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/comments?post=1326"}],"version-history":[{"count":5,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1326\/revisions"}],"predecessor-version":[{"id":7090,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1326\/revisions\/7090"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/media\/4185"}],"wp:attachment":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/media?parent=1326"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/categories?post=1326"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/tags?post=1326"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}