{"id":1469,"date":"2026-07-22T05:33:25","date_gmt":"2026-07-22T05:33:25","guid":{"rendered":"https:\/\/lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/"},"modified":"2026-09-27T06:17:31","modified_gmt":"2026-09-27T06:17:31","slug":"what-should-be-noted-when-assembling-the-transformer-winding-2","status":"publish","type":"post","link":"https:\/\/www.lstransformer.com\/fr\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","title":{"rendered":"What should be noted when assembling the transformer winding? (2)"},"content":{"rendered":"<h1 style=\"text-align: left;\">What should be noted when assembling the transformer winding? (2)<\/h1>\n<p>In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.<\/p>\n<h2><strong>Contenu<\/strong><b><\/b><\/h2>\n<h3><em>1. Symmetry and alignment in the height direction<\/em><\/h3>\n<h6 style=\"padding-left: 40px;\"><strong>(1) Height difference and reasons of high-voltage and low-voltage windings:<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">\u00a0Winding assembly needs to maintain symmetry in the height direction. Due to the high voltage to ground, the high-voltage winding has a large insulation distance and is generally shorter than the low-voltage winding. Moreover, due to manufacturing tolerances, there are tolerances in the heights of high-voltage and low-voltage windings. These factors need to be considered during assembly.<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(2) Importance of geometric center alignment:<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Ensuring the alignment of the geometric centers of high-voltage and low-voltage windings is of crucial importance. Misalignment will increase the axial electromagnetic force, leading to a further expansion of the height difference, affecting the overall structural stability and performance of the transformer. For example, it may cause winding loosening and deformation, affect electromagnetic coupling, increase losses, and even cause local overheating.<\/p>\n<p><a title=\"Transformateur, de Gros Transformateurs de Fournitures et de Fabricants,Sp\u00e9cialis\u00e9e dans les Transformateurs de 49 ans\" href=\"https:\/\/www.lstransformer.com\/fr\/Transformers\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-family: Calibri Light;\"><img decoding=\"async\" class=\"aligncenter\" title=\"56\" src=\"https:\/\/manage.lstransformer.com\/upload\/news\/1741946589389040.jpg\" alt=\"undefined\" \/><\/span><\/a><\/p>\n<h3><em>2. Core protection and optimization of assembly method during the assembly process<\/em><\/h3>\n<h6 style=\"padding-left: 40px;\"><strong>(1) Protective measures for the upper end of the core:<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">When assembling windings on the iron core bound with glass adhesive tape, the upper end of the core column should be clamped and tied firmly in advance with clamps and straps to prevent the iron core sheets from toppling and causing the adhesive tape to crack, thus destroying the integrity and insulation performance of the core and affecting the operation of the transformer.<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(2) Advantages of overall combined assembly:\u00a0<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">For winding assembly, it is advisable to assemble the windings together first and then assemble them as a whole on the iron core column. This can speed up the assembly speed of the transformer body, improve production efficiency, and at the same time reduce the possibility of moisture absorption and ensure insulation performance and operational reliability.<\/p>\n<p><a title=\"Transformateur, de Gros Transformateurs de Fournitures et de Fabricants,Sp\u00e9cialis\u00e9e dans les Transformateurs de 49 ans\" href=\"https:\/\/www.lstransformer.com\/fr\/Transformers\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"aligncenter\" title=\"57\" src=\"https:\/\/manage.lstransformer.com\/upload\/news\/1741946616316829.jpg\" alt=\"undefined\" \/><\/a><\/p>\n<h2><strong>En R\u00e9sum\u00e9<\/strong><\/h2>\n<p>In short, during the transformer winding assembly process, points such as winding direction, misalignment control, height alignment, iron core protection, and assembly method all need to be strictly controlled. Operators must have a high sense of responsibility and professional skills to ensure that each link is accurate and error-free to guarantee the quality and performance of the transformer and provide strong support for the stable operation of the power system. Any negligence may cause serious problems and must be taken seriously.<\/p>\n<h2 style=\"font-weight: bold;\">Contact<\/h2>\n<p>LuShan, heure de l'est. 1975, est un fabricant professionnel Chinois sp\u00e9cialis\u00e9 dans les transformateurs de puissance et des r\u00e9acteurs de plus de 50 ans. Les produits de pointe sont <a href=\"https:\/\/www.lstransformer.com\/fr\/\">transformateur monophas\u00e9, triphas\u00e9 transformateurs d'isolement, transformateur \u00e9lectrique, transformateur de distribution, l'\u00e9tape vers le bas et d'intensifier le transformateur de basse tension du transformateur, transformateur \u00e0 haute tension, contr\u00f4le de transformateur toro\u00efdal transformateur, transformateur R-core; inductances DC, AC r\u00e9acteurs, le filtrage du r\u00e9acteur, de ligne et de charge du r\u00e9acteur, des bobines, le filtrage du r\u00e9acteur, et interm\u00e9diaire, \u00e0 haute fr\u00e9quence produits<\/a>.<\/p>\n<p>Nos transformateurs de puissance et les r\u00e9acteurs sont largement utilis\u00e9s dans les 10 domaines d'application: transport en commun rapide, les machines de construction, les \u00e9nergies renouvelables, intelligents de fabrication, des \u00e9quipements m\u00e9dicaux, de la mine de charbon de l'explosion de la pr\u00e9vention, de l'excitation du syst\u00e8me, frittage sous vide(four), d'une climatisation centrale.<\/p>\n<p>En savoir plus sur transformateur de puissance et le r\u00e9acteur: <a href=\"https:\/\/www.lstransformer.com\/fr\/\">www.lstransformer.com<\/a>.<\/p>\n<p>Si vous souhaitez obtenir des solutions personnalis\u00e9es pour les transformateurs ou des r\u00e9acteurs, veuillez nous contacter.<br \/>\nWhatsApp\uff1a+86 13787095096<br \/>\nE-mail: marketing@hnlsdz.com<\/p>","protected":false},"excerpt":{"rendered":"<p>What should be noted when assembling the transformer winding? (2) In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process. Content 1. Symmetry and alignment in the height direction (1) [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2184,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-1469","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD<\/title>\n<meta name=\"description\" content=\"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lstransformer.com\/fr\/what-should-be-noted-when-assembling-the-transformer-winding-2\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"og:description\" content=\"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lstransformer.com\/fr\/what-should-be-noted-when-assembling-the-transformer-winding-2\/\" \/>\n<meta property=\"og:site_name\" content=\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T05:33:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-27T06:17:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png\" \/>\n\t<meta property=\"og:image:width\" content=\"370\" \/>\n\t<meta property=\"og:image:height\" content=\"276\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"369703005\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"369703005\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\"},\"author\":{\"name\":\"369703005\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\"},\"headline\":\"What should be noted when assembling the transformer winding? (2)\",\"datePublished\":\"2026-07-22T05:33:25+00:00\",\"dateModified\":\"2026-09-27T06:17:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\"},\"wordCount\":546,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672245224397.png\",\"articleSection\":[\"FAQ\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\",\"name\":\"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672245224397.png\",\"datePublished\":\"2026-07-22T05:33:25+00:00\",\"dateModified\":\"2026-09-27T06:17:31+00:00\",\"description\":\"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672245224397.png\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672245224397.png\",\"width\":370,\"height\":276},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/what-should-be-noted-when-assembling-the-transformer-winding-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.lstransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What should be noted when assembling the transformer winding? (2)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lstransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"width\":760,\"height\":202,\"caption\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\",\"name\":\"369703005\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"caption\":\"369703005\"},\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/fr\\\/author\\\/369703005\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lstransformer.com\/fr\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","og_locale":"fr_FR","og_type":"article","og_title":"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","og_description":"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.","og_url":"https:\/\/www.lstransformer.com\/fr\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","og_site_name":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","article_published_time":"2026-07-22T05:33:25+00:00","article_modified_time":"2026-09-27T06:17:31+00:00","og_image":[{"width":370,"height":276,"url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","type":"image\/png"}],"author":"369703005","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"369703005","Dur\u00e9e de lecture estim\u00e9e":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#article","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/"},"author":{"name":"369703005","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289"},"headline":"What should be noted when assembling the transformer winding? (2)","datePublished":"2026-07-22T05:33:25+00:00","dateModified":"2026-09-27T06:17:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/"},"wordCount":546,"publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"image":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","articleSection":["FAQ"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","url":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/","name":"What should be noted when assembling the transformer winding? (2) - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#primaryimage"},"image":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","datePublished":"2026-07-22T05:33:25+00:00","dateModified":"2026-09-27T06:17:31+00:00","description":"In transformer manufacturing, the winding assembly process is of crucial importance and directly relates to the performance and operational reliability of the transformer. The following focuses on the key points in the winding assembly process.","breadcrumb":{"@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#primaryimage","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672245224397.png","width":370,"height":276},{"@type":"BreadcrumbList","@id":"https:\/\/www.lstransformer.com\/what-should-be-noted-when-assembling-the-transformer-winding-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.lstransformer.com\/"},{"@type":"ListItem","position":2,"name":"What should be noted when assembling the transformer winding? (2)"}]},{"@type":"WebSite","@id":"https:\/\/www.lstransformer.com\/#website","url":"https:\/\/www.lstransformer.com\/","name":"LS transformateur de puissance, r\u00e9acteur de Ligne \u00e0 Haute tension transformateur d'Huile de transformateur immerg\u00e9-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"","publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lstransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.lstransformer.com\/#organization","name":"LS transformateur de puissance, r\u00e9acteur de Ligne \u00e0 Haute tension transformateur d'Huile de transformateur immerg\u00e9-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","url":"https:\/\/www.lstransformer.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","width":760,"height":202,"caption":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD"},"image":{"@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289","name":"369703005","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","caption":"369703005"},"url":"https:\/\/www.lstransformer.com\/fr\/author\/369703005\/"}]}},"_links":{"self":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1469","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/comments?post=1469"}],"version-history":[{"count":6,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1469\/revisions"}],"predecessor-version":[{"id":6537,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1469\/revisions\/6537"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/media\/2184"}],"wp:attachment":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/media?parent=1469"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/categories?post=1469"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/tags?post=1469"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}