{"id":1500,"date":"2026-07-22T05:33:27","date_gmt":"2026-07-22T05:33:27","guid":{"rendered":"https:\/\/lstransformer.com\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/"},"modified":"2026-09-27T08:58:07","modified_gmt":"2026-09-27T08:58:07","slug":"what-checks-should-be-conducted-before-operating-a-dry-type-transformer","status":"publish","type":"post","link":"https:\/\/www.lstransformer.com\/fr\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/","title":{"rendered":"What checks should be conducted before operating a dry-type transformer?"},"content":{"rendered":"<h1 style=\"text-align: left;\">What checks should be conducted before operating a dry-type transformer?<b><\/b><\/h1>\n<p>The pre-operation inspection of dry-type transformers is a crucial step to ensure the equipment operates safely and stably. The following are the detailed inspection items and steps:<\/p>\n<h2><b>Contenu<\/b><\/h2>\n<h3><em>1. Inspection of Component Tightening<\/em><\/h3>\n<p>Before operating the transformer, it is essential to conduct a thorough inspection of all components to ensure there are no loose parts. Even if no looseness is apparent, all bolts and connections should be re-tightened. This is necessary because vibrations during transportation and installation may cause parts to loosen, potentially affecting the equipment&#8217;s normal operation and safety.<\/p>\n<h3><em>2. Ventilation System Inspection<\/em><\/h3>\n<p>The ventilation openings of dry-type transformers are critical for heat dissipation and proper operation. When inspecting the ventilation system, pay attention to the following:<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(1) Dust Removal: <\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Check for the accumulation of dust or debris at the ventilation openings. If dust is present, it should be removed immediately to ensure unobstructed airflow. Accumulated dust can hinder heat dissipation and cause the equipment to overheat.<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(2) Ventilation Direction: <\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Carefully check the rotation direction of the fan. Normally, the airflow should enter the coil from the bottom. If the airflow direction is reversed, it indicates that the fan is operating in reverse and should be adjusted according to the manufacturer&#8217;s instructions.<\/p>\n<h3><em>3. Auxiliary Equipment Inspection<\/em><\/h3>\n<p>The proper functioning of auxiliary equipment is vital for the safe operation of dry-type transformers, particularly temperature control devices and power fans:<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(1) Power Fan: <\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Ensure that the power fan operates correctly. Verify that the fan wiring is correct and that the fan starts and runs properly at the rated voltage.<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(2) Temperature Control Devices:<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Ensure the wiring and settings of temperature control devices are accurate. Check that the temperature sensor is properly installed to monitor the transformer&#8217;s temperature accurately.<\/p>\n<h3><em>4. Electrical Connection Inspection<\/em><b><\/b><\/h3>\n<p>The quality of electrical connections directly affects the performance and safety of dry-type transformers. When inspecting electrical connections, consider the following aspects:<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(1) Terminal Connections: <\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Check that terminal connections are secure and that there are no loose wires.<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(2) Insulation Condition: <\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Inspect the insulation of electrical connections to ensure that there is no damage or aging of the insulation material.<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(3) Grounding: <\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Ensure that the transformer\u2019s grounding connections are solid and that the grounding resistance meets relevant standards.<\/p>\n<p><a href=\"https:\/\/www.lstransformer.com\/fr\/Transformers\/\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-2115\" src=\"https:\/\/lstransformer.com\/wp-content\/uploads\/2026\/07\/17421986418117221.jpg\" alt=\"\" width=\"920\" height=\"498\" srcset=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/17421986418117221.jpg 920w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/17421986418117221-600x325.jpg 600w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/17421986418117221-300x162.jpg 300w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/17421986418117221-768x416.jpg 768w\" sizes=\"(max-width: 920px) 100vw, 920px\" \/><\/a><\/p>\n<h3><em>5. Test Run Inspection<\/em><b><\/b><\/h3>\n<p>After completing all the above checks, conduct a test run to verify the performance parameters of the equipment.<\/p>\n<p>During the test run, observe the following:<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(1) No-Load Test Run:<\/strong><\/h6>\n<p style=\"padding-left: 40px;\">Start with a no-load test run to observe whether the transformer&#8217;s parameters, such as voltage, current, and temperature, are normal.<\/p>\n<h6 style=\"padding-left: 40px;\"><strong>(2) Incremental Loading: <\/strong><\/h6>\n<p style=\"padding-left: 40px;\">If the no-load test run is satisfactory, gradually increase the load and observe the transformer\u2019s performance under different load conditions.<\/p>\n<h3><em>6. Documentation and Reporting<\/em><b><\/b><\/h3>\n<p>During the inspection and test run, maintain detailed records, including any identified issues and the corresponding corrective actions. Prepare an inspection report to provide a reference for the equipment\u2019s subsequent operation and maintenance.<\/p>\n<h2><b>En r\u00e9sum\u00e9<\/b><\/h2>\n<p>The pre-operation inspection of dry-type transformers is a systematic process that requires a comprehensive and meticulous examination of various aspects, including component tightening, ventilation systems, auxiliary equipment, electrical connections, and test runs. This not only ensures the safe and reliable operation of the transformer but also extends the equipment&#8217;s service life and enhances the overall efficiency of the power system. In practice, inspections should be conducted strictly according to relevant standards and instructions to ensure that no detail is overlooked.<\/p>\n<p><a title=\"Transformateur, de Gros Transformateurs de Fournitures et de Fabricants,Sp\u00e9cialis\u00e9e dans les Transformateurs de 49 ans\" href=\"https:\/\/www.lstransformer.com\/fr\/Transformers\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"aligncenter\" title=\"62\" src=\"https:\/\/manage.lstransformer.com\/upload\/news\/1742198653228465.jpg\" alt=\"undefined\" width=\"400\" height=\"383\" border=\"0\" vspace=\"0\" \/><\/a><\/p>\n<h2 style=\"font-weight: bold;\">Contact<\/h2>\n<p>LuShan, heure de l'est. 1975, est un fabricant professionnel Chinois sp\u00e9cialis\u00e9 dans les transformateurs de puissance et des r\u00e9acteurs de plus de 50 ans. Les produits de pointe sont <a href=\"https:\/\/www.lstransformer.com\/fr\/\">transformateur monophas\u00e9, triphas\u00e9 transformateurs d'isolement, transformateur \u00e9lectrique, transformateur de distribution, l'\u00e9tape vers le bas et d'intensifier le transformateur de basse tension du transformateur, transformateur \u00e0 haute tension, contr\u00f4le de transformateur toro\u00efdal transformateur, transformateur R-core; inductances DC, AC r\u00e9acteurs, le filtrage du r\u00e9acteur, de ligne et de charge du r\u00e9acteur, des bobines, le filtrage du r\u00e9acteur, et interm\u00e9diaire, \u00e0 haute fr\u00e9quence produits<\/a>.<\/p>\n<p>Nos transformateurs de puissance et les r\u00e9acteurs sont largement utilis\u00e9s dans les 10 domaines d'application: transport en commun rapide, les machines de construction, les \u00e9nergies renouvelables, intelligents de fabrication, des \u00e9quipements m\u00e9dicaux, de la mine de charbon de l'explosion de la pr\u00e9vention, de l'excitation du syst\u00e8me, frittage sous vide(four), d'une climatisation centrale.<\/p>\n<p>En savoir plus sur transformateur de puissance et le r\u00e9acteur: <a href=\"https:\/\/www.lstransformer.com\/fr\/\">www.lstransformer.com<\/a>.<\/p>\n<p>Si vous souhaitez obtenir des solutions personnalis\u00e9es pour les transformateurs ou des r\u00e9acteurs, veuillez nous contacter.<br \/>\nWhatsApp\uff1a+86 13787095096<br \/>\nE-mail: marketing@hnlsdz.com<\/p>","protected":false},"excerpt":{"rendered":"<p>What checks should be conducted before operating a dry-type transformer? The pre-operation inspection of dry-type transformers is a crucial step to ensure the equipment operates safely and stably. The following are the detailed inspection items and steps: Content 1. Inspection of Component Tightening Before operating the transformer, it is essential to conduct a thorough inspection [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2099,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-1500","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>What checks should be conducted before operating a dry-type transformer? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD<\/title>\n<meta name=\"description\" content=\"The pre-operation inspection of dry-type transformers is a crucial step to ensure the equipment operates safely and stably. The following are the detailed inspection items and steps:\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lstransformer.com\/fr\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What checks should be conducted before operating a dry-type transformer? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"og:description\" content=\"The pre-operation inspection of dry-type transformers is a crucial step to ensure the equipment operates safely and stably. The following are the detailed inspection items and steps:\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lstransformer.com\/fr\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/\" \/>\n<meta property=\"og:site_name\" content=\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-22T05:33:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-27T08:58:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672987581053.png\" \/>\n\t<meta property=\"og:image:width\" content=\"370\" \/>\n\t<meta property=\"og:image:height\" content=\"276\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"369703005\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"369703005\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/\"},\"author\":{\"name\":\"369703005\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\"},\"headline\":\"What checks should be conducted before operating a dry-type transformer?\",\"datePublished\":\"2026-07-22T05:33:27+00:00\",\"dateModified\":\"2026-09-27T08:58:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/\"},\"wordCount\":703,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672987581053.png\",\"articleSection\":[\"FAQ\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/\",\"name\":\"What checks should be conducted before operating a dry-type transformer? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672987581053.png\",\"datePublished\":\"2026-07-22T05:33:27+00:00\",\"dateModified\":\"2026-09-27T08:58:07+00:00\",\"description\":\"The pre-operation inspection of dry-type transformers is a crucial step to ensure the equipment operates safely and stably. The following are the detailed inspection items and steps:\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672987581053.png\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/1741672987581053.png\",\"width\":370,\"height\":276},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/ja\\\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.lstransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What checks should be conducted before operating a dry-type transformer?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lstransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"width\":760,\"height\":202,\"caption\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/674089c15f4857c19a997f886816d289\",\"name\":\"369703005\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g\",\"caption\":\"369703005\"},\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/fr\\\/author\\\/369703005\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What checks should be conducted before operating a dry-type transformer? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"The pre-operation inspection of dry-type transformers is a crucial step to ensure the equipment operates safely and stably. The following are the detailed inspection items and steps:","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lstransformer.com\/fr\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/","og_locale":"fr_FR","og_type":"article","og_title":"What checks should be conducted before operating a dry-type transformer? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","og_description":"The pre-operation inspection of dry-type transformers is a crucial step to ensure the equipment operates safely and stably. The following are the detailed inspection items and steps:","og_url":"https:\/\/www.lstransformer.com\/fr\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/","og_site_name":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","article_published_time":"2026-07-22T05:33:27+00:00","article_modified_time":"2026-09-27T08:58:07+00:00","og_image":[{"width":370,"height":276,"url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672987581053.png","type":"image\/png"}],"author":"369703005","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"369703005","Dur\u00e9e de lecture estim\u00e9e":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/#article","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/"},"author":{"name":"369703005","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289"},"headline":"What checks should be conducted before operating a dry-type transformer?","datePublished":"2026-07-22T05:33:27+00:00","dateModified":"2026-09-27T08:58:07+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/"},"wordCount":703,"publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"image":{"@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672987581053.png","articleSection":["FAQ"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/","url":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/","name":"What checks should be conducted before operating a dry-type transformer? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/#primaryimage"},"image":{"@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672987581053.png","datePublished":"2026-07-22T05:33:27+00:00","dateModified":"2026-09-27T08:58:07+00:00","description":"The pre-operation inspection of dry-type transformers is a crucial step to ensure the equipment operates safely and stably. The following are the detailed inspection items and steps:","breadcrumb":{"@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/#primaryimage","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672987581053.png","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/07\/1741672987581053.png","width":370,"height":276},{"@type":"BreadcrumbList","@id":"https:\/\/www.lstransformer.com\/ja\/what-checks-should-be-conducted-before-operating-a-dry-type-transformer\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.lstransformer.com\/"},{"@type":"ListItem","position":2,"name":"What checks should be conducted before operating a dry-type transformer?"}]},{"@type":"WebSite","@id":"https:\/\/www.lstransformer.com\/#website","url":"https:\/\/www.lstransformer.com\/","name":"LS transformateur de puissance, r\u00e9acteur de Ligne \u00e0 Haute tension transformateur d'Huile de transformateur immerg\u00e9-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","description":"","publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lstransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.lstransformer.com\/#organization","name":"LS transformateur de puissance, r\u00e9acteur de Ligne \u00e0 Haute tension transformateur d'Huile de transformateur immerg\u00e9-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","url":"https:\/\/www.lstransformer.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","width":760,"height":202,"caption":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD"},"image":{"@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/674089c15f4857c19a997f886816d289","name":"369703005","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/dcaa0e47cd7b6c99ffdd80f5772032ed2d2591b5b8e7b905e5fd87a850954248?s=96&d=mm&r=g","caption":"369703005"},"url":"https:\/\/www.lstransformer.com\/fr\/author\/369703005\/"}]}},"_links":{"self":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1500","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/comments?post=1500"}],"version-history":[{"count":7,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1500\/revisions"}],"predecessor-version":[{"id":6596,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/posts\/1500\/revisions\/6596"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/media\/2099"}],"wp:attachment":[{"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/media?parent=1500"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/categories?post=1500"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lstransformer.com\/fr\/wp-json\/wp\/v2\/tags?post=1500"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}