{"id":7296,"date":"2026-11-05T06:40:24","date_gmt":"2026-11-05T06:40:24","guid":{"rendered":"https:\/\/www.lstransformer.com\/?p=7296"},"modified":"2026-10-26T12:16:07","modified_gmt":"2026-10-26T12:16:07","slug":"why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown","status":"publish","type":"post","link":"https:\/\/www.lstransformer.com\/ru\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/","title":{"rendered":"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown?"},"content":{"rendered":"<h1>Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown?<\/h1>\n<p>For transformer and reactor maintenance engineers, performing regular Insulation Resistance Testing is a key part of preventive maintenance. It helps assess the health of the insulation between windings and ground, predicting potential faults. However, a common and dangerous mistake is testing immediately after shutdown.<\/p>\n<p><a href=\"https:\/\/www.lstransformer.com\/ru\/product-category\/transformer\/\" target=\"_blank\" rel=\"noopener\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-7297\" src=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/1-4.jpg\" alt=\"\" width=\"920\" height=\"498\" srcset=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/1-4.jpg 920w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/1-4-300x162.jpg 300w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/1-4-768x416.jpg 768w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/1-4-18x10.jpg 18w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/1-4-600x325.jpg 600w\" sizes=\"(max-width: 920px) 100vw, 920px\" \/><\/a><\/p>\n<h3><em>1.Why is it necessary to wait before testing?<\/em><\/h3>\n<p>Testing right after de-energization poses risks in two main areas: <strong><b>Personnel &amp; Equipment Safety and Test Data Validity<\/b><\/strong>.<\/p>\n<h4 style=\"padding-left: 40px;\"><strong>1.1\u00a0Primary Threat:<\/strong><\/h4>\n<p style=\"padding-left: 40px;\">Residual Charge &amp; Safety Hazards After shutdown, significant residual charge remains stored in the windings and internal capacitance, especially in large power transformers. This charge needs time to dissipate. Connecting an insulation resistance tester (Megger) immediately creates a rapid discharge path.<\/p>\n<p style=\"padding-left: 80px;\"><span style=\"color: #4874cb;\">(1) Consequence:<\/span>Extremely high instantaneous discharge current can damage the tester and cause fatal electric shock to personnel. It may also cause secondary damage to the internal insulation that hasn&#8217;t fully recovered.<\/p>\n<p style=\"padding-left: 80px;\"><span style=\"color: #4874cb;\">(2) Reason:\u00a0<\/span>The tester is a DC high-voltage source (common test voltages: 500V, 1000V, 2500V, 5000V). Connecting it to an energized object forces a rapid, uncontrolled redistribution or discharge of energy.\u00a0Safety standards (like IEEE and IEC) mandate a waiting period primarily to allow natural discharge to a safe voltage level.<\/p>\n<h4 style=\"padding-left: 40px;\"><strong><b>1.<\/b><\/strong><strong><b>2<\/b><\/strong><strong><b>\u00a0<\/b><\/strong><strong><b>Core Interference: <\/b><\/strong><\/h4>\n<p style=\"padding-left: 40px;\">Temperature &amp; Dielectric Absorption Even ignoring safety, data from a hot transformer does not accurately reflect true insulation condition.<\/p>\n<p style=\"padding-left: 80px;\"><span style=\"color: #4874cb;\">(1) Temperature Effect:\u00a0<\/span>Operating windings can reach 80-100\u00b0C or higher. Insulation materials have a strong\u00a0negative temperature coefficient\u2014resistance drops sharply as temperature rises. This leads to falsely low readings, potentially suggesting insulation degradation.<\/p>\n<p style=\"padding-left: 80px;\"><span style=\"color: #4874cb;\">(2) Dielectric Absorption &amp; Polarization:\u00a0<\/span>Transformer insulation is a complex multi-layer system (oil, paper, pressboard). Under DC voltage, various internal polarization processes occur, requiring time to stabilize. Testing immediately after shutdown, while the dielectric is still in an unstable &#8220;excited&#8221; state, yields rapidly changing, unrealistic readings.<\/p>\n<h3><em>2.How long should you wait before testing?<\/em><\/h3>\n<p>There&#8217;s no fixed time. It depends on voltage rating, capacity, and operating temperature. Standards like IEEE Std 43-2013\u00a0provide guidance. A general rule is to wait at least 4 to 8 times the thermal time constant, or until the equipment temperature is close to ambient temperature. For large transformers, this often means several hours or more.<\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"341\"><strong><b>Equipment Type \/ Voltage Level<\/b><\/strong><\/td>\n<td width=\"355\"><strong><b>Suggested Minimum Wait Time<\/b><\/strong><\/td>\n<td width=\"346\"><strong><b>\u041a\u043b\u044e\u0447\u0435\u0432\u044b\u0435 \u0441\u043e\u043e\u0431\u0440\u0430\u0436\u0435\u043d\u0438\u044f<\/b><\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"341\">Low Voltage Distribution Transformer (\u22641000V)<\/td>\n<td width=\"355\">30 minutes &#8211; 2 hours<\/td>\n<td width=\"346\">Residual charge dissipation, initial cooling.<\/td>\n<\/tr>\n<tr>\n<td width=\"341\">Medium Voltage Transformer (1kV &#8211; 35kV)<\/td>\n<td width=\"355\">2 hours &#8211; 8 hours<\/td>\n<td width=\"346\">Higher capacitive energy storage, requires more thorough discharge and cooling.<\/td>\n<\/tr>\n<tr>\n<td width=\"341\">High\/Extra-High Voltage Power Transformer (\u226566kV)<\/td>\n<td width=\"355\">8+ hours, often 24 hours recommended<\/td>\n<td width=\"346\">Large capacitance, complex insulation, significant dielectric absorption, needs cooling to ambient temperature.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"table-note\" style=\"text-align: center;\">Table: Suggested Minimum Waiting Time Reference<\/div>\n<p>Important:\u00a0This table is a general guide. Always follow the manufacturer&#8217;s specific manual and your site&#8217;s Lockout\/Tagout (LOTO) procedures. Before contacting any terminals, always verify the equipment is de-energized using a calibrated high-voltage detector.<\/p>\n<h3><em>3. How to obtain and interpret valid insulation resistance data?<\/em><\/h3>\n<p>After sufficient cooling and discharge, proceed with testing. Correct interpretation is crucial, utilizing two key diagnostic parameters: Dielectric Absorption Ratio (DAR) and Polarization Index (PI).<\/p>\n<h4 style=\"padding-left: 40px;\"><strong>3.1 Dielectric Absorption Ratio (DAR):\u00a0<\/strong><\/h4>\n<p style=\"padding-left: 80px;\"><span style=\"color: #4874cb;\">(1) <\/span>Ratio of the 60-second insulation resistance value to the 15-second value. (DAR = R\u2086\u2080s \/ R\u2081\u2085s)<\/p>\n<p style=\"padding-left: 80px;\"><span style=\"color: #4874cb;\">(2) Polarization Index (PI):\u00a0<\/span>Ratio of the 10-minute insulation resistance value to the 1-minute value. (PI = R\u2081\u2080min \/ R\u2081min)<\/p>\n<h4 style=\"padding-left: 40px;\"><strong><b>3.2<\/b><\/strong><strong><b>Why are they effective? <\/b><\/strong><\/h4>\n<p style=\"padding-left: 40px;\">Good, dry, clean insulation shows a significant increase in resistance over time under DC voltage as the absorption current decays slowly. For wet or contaminated insulation, the steady leakage current dominates, so resistance doesn&#8217;t rise much.<\/p>\n<p style=\"padding-left: 40px;\">PI and DAR essentially compare the slow polarization (absorption) current to the steady leakage current.\u00a0A high ratio indicates good insulation; a ratio near 1 indicates moisture or contamination.<\/p>\n<p><a href=\"https:\/\/www.lstransformer.com\/ru\/product-category\/transformer\/\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-7298\" src=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/2-4.jpg\" alt=\"\" width=\"920\" height=\"498\" srcset=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/2-4.jpg 920w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/2-4-300x162.jpg 300w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/2-4-768x416.jpg 768w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/2-4-18x10.jpg 18w, https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/2-4-600x325.jpg 600w\" sizes=\"(max-width: 920px) 100vw, 920px\" \/><\/a><\/p>\n<h2><strong><b>\u0417\u0430\u043a\u043b\u044e\u0447\u0435\u043d\u0438\u0435<\/b><\/strong><\/h2>\n<p>Safety First, Wait Patiently:\u00a0Follow proper isolation, discharge, and verification procedures. Allow adequate cooling and natural discharge time.\u00a0By following this process, you ensure safety and transform a simple check into a powerful diagnostic tool for predicting transformer health. High-quality maintenance data is the foundation for optimal operational decisions.<\/p>\n<p>Disclaimer: This information is based on general international standards and practices. Always prioritize the manufacturer&#8217;s instructions, local\/national safety codes, and have work performed by qualified personnel.<\/p>\n<h2 style=\"font-weight: bold;\">\u041a\u043e\u043d\u0442\u0430\u043a\u0442\u044b<\/h2>\n<p>\u041a\u043e\u043c\u043f\u0430\u043d\u0438\u044f LuShan, \u043e\u0441\u043d\u043e\u0432\u0430\u043d\u043d\u0430\u044f \u0432 1975 \u0433\u043e\u0434\u0443, \u044f\u0432\u043b\u044f\u0435\u0442\u0441\u044f \u043a\u0438\u0442\u0430\u0439\u0441\u043a\u0438\u043c \u043f\u0440\u043e\u0444\u0435\u0441\u0441\u0438\u043e\u043d\u0430\u043b\u044c\u043d\u044b\u043c \u043f\u0440\u043e\u0438\u0437\u0432\u043e\u0434\u0438\u0442\u0435\u043b\u0435\u043c, \u0441\u043f\u0435\u0446\u0438\u0430\u043b\u0438\u0437\u0438\u0440\u0443\u044e\u0449\u0438\u043c\u0441\u044f \u043d\u0430 \u0441\u0438\u043b\u043e\u0432\u044b\u0445 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u0430\u0445 \u0438 \u0440\u0435\u0430\u043a\u0442\u043e\u0440\u0430\u0445 \u0431\u043e\u043b\u0435\u0435 50 \u043b\u0435\u0442. \u0412\u0435\u0434\u0443\u0449\u0438\u043c\u0438 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0430\u043c\u0438 \u044f\u0432\u043b\u044f\u044e\u0442\u0441\u044f <a href=\"https:\/\/www.lstransformer.com\/ru\/\">\u043e\u0434\u043d\u043e\u0444\u0430\u0437\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440, \u0442\u0440\u0435\u0445\u0444\u0430\u0437\u043d\u044b\u0435 \u0438\u0437\u043e\u043b\u0438\u0440\u0443\u044e\u0449\u0438\u0435 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u044b, \u044d\u043b\u0435\u043a\u0442\u0440\u0438\u0447\u0435\u0441\u043a\u0438\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440, \u0440\u0430\u0441\u043f\u0440\u0435\u0434\u0435\u043b\u0438\u0442\u0435\u043b\u044c\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440, \u043f\u043e\u043d\u0438\u0436\u0430\u044e\u0449\u0438\u0439 \u0438 \u043f\u043e\u0432\u044b\u0448\u0430\u044e\u0449\u0438\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u044b, \u043d\u0438\u0437\u043a\u043e\u0432\u043e\u043b\u044c\u0442\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440, \u0432\u044b\u0441\u043e\u043a\u043e\u0432\u043e\u043b\u044c\u0442\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440, \u0443\u043f\u0440\u0430\u0432\u043b\u044f\u044e\u0449\u0438\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440, \u0442\u043e\u0440\u043e\u0438\u0434\u0430\u043b\u044c\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440, R-\u043e\u0431\u0440\u0430\u0437\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440; \u043a\u0430\u0442\u0443\u0448\u043a\u0438 \u0438\u043d\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0438 \u043f\u043e\u0441\u0442\u043e\u044f\u043d\u043d\u043e\u0433\u043e \u0442\u043e\u043a\u0430, \u0440\u0435\u0430\u043a\u0442\u043e\u0440\u044b \u043f\u0435\u0440\u0435\u043c\u0435\u043d\u043d\u043e\u0433\u043e \u0442\u043e\u043a\u0430, \u0444\u0438\u043b\u044c\u0442\u0440\u0443\u044e\u0449\u0438\u0439 \u0440\u0435\u0430\u043a\u0442\u043e\u0440, \u043b\u0438\u043d\u0435\u0439\u043d\u044b\u0439 \u0438 \u043d\u0430\u0433\u0440\u0443\u0437\u043e\u0447\u043d\u044b\u0439 \u0440\u0435\u0430\u043a\u0442\u043e\u0440\u044b, \u0434\u0440\u043e\u0441\u0441\u0435\u043b\u0438, \u0444\u0438\u043b\u044c\u0442\u0440\u0443\u044e\u0449\u0438\u0439 \u0440\u0435\u0430\u043a\u0442\u043e\u0440 \u0438 \u043f\u0440\u043e\u043c\u0435\u0436\u0443\u0442\u043e\u0447\u043d\u044b\u0435 \u0432\u044b\u0441\u043e\u043a\u043e\u0447\u0430\u0441\u0442\u043e\u0442\u043d\u044b\u0435 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u044b<\/a>.<\/p>\n<p>\u041d\u0430\u0448\u0438 \u0441\u0438\u043b\u043e\u0432\u044b\u0435 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u044b \u0438 \u0440\u0435\u0430\u043a\u0442\u043e\u0440\u044b \u0448\u0438\u0440\u043e\u043a\u043e \u0438\u0441\u043f\u043e\u043b\u044c\u0437\u0443\u044e\u0442\u0441\u044f \u0432 10 \u043e\u0431\u043b\u0430\u0441\u0442\u044f\u0445 \u043f\u0440\u0438\u043c\u0435\u043d\u0435\u043d\u0438\u044f: \u0441\u043a\u043e\u0440\u043e\u0441\u0442\u043d\u043e\u0439 \u0442\u0440\u0430\u043d\u0441\u043f\u043e\u0440\u0442, \u0441\u0442\u0440\u043e\u0438\u0442\u0435\u043b\u044c\u043d\u0430\u044f \u0442\u0435\u0445\u043d\u0438\u043a\u0430, \u0432\u043e\u0437\u043e\u0431\u043d\u043e\u0432\u043b\u044f\u0435\u043c\u044b\u0435 \u0438\u0441\u0442\u043e\u0447\u043d\u0438\u043a\u0438 \u044d\u043d\u0435\u0440\u0433\u0438\u0438, \u0438\u043d\u0442\u0435\u043b\u043b\u0435\u043a\u0442\u0443\u0430\u043b\u044c\u043d\u043e\u0435 \u043f\u0440\u043e\u0438\u0437\u0432\u043e\u0434\u0441\u0442\u0432\u043e, \u043c\u0435\u0434\u0438\u0446\u0438\u043d\u0441\u043a\u043e\u0435 \u043e\u0431\u043e\u0440\u0443\u0434\u043e\u0432\u0430\u043d\u0438\u0435, \u043f\u0440\u0435\u0434\u043e\u0442\u0432\u0440\u0430\u0449\u0435\u043d\u0438\u0435 \u0432\u0437\u0440\u044b\u0432\u043e\u0432 \u0432 \u0443\u0433\u043e\u043b\u044c\u043d\u044b\u0445 \u0448\u0430\u0445\u0442\u0430\u0445, \u0441\u0438\u0441\u0442\u0435\u043c\u044b \u0432\u043e\u0437\u0431\u0443\u0436\u0434\u0435\u043d\u0438\u044f, \u0432\u0430\u043a\u0443\u0443\u043c\u043d\u044b\u0435 \u043f\u0435\u0447\u0438 \u0441\u043f\u0435\u043a\u0430\u043d\u0438\u044f, \u0446\u0435\u043d\u0442\u0440\u0430\u043b\u044c\u043d\u043e\u0435 \u043a\u043e\u043d\u0434\u0438\u0446\u0438\u043e\u043d\u0438\u0440\u043e\u0432\u0430\u043d\u0438\u0435 \u0432\u043e\u0437\u0434\u0443\u0445\u0430.<\/p>\n<p>\u0423\u0437\u043d\u0430\u0439\u0442\u0435 \u0431\u043e\u043b\u044c\u0448\u0435 \u043e \u0441\u0438\u043b\u043e\u0432\u043e\u043c \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u0435 \u0438 \u0440\u0435\u0430\u043a\u0442\u043e\u0440\u0435: <a href=\"https:\/\/www.lstransformer.com\/ru\/\">www.lstransformer.com<\/a>.<\/p>\n<p>\u0415\u0441\u043b\u0438 \u0432\u044b \u0445\u043e\u0442\u0438\u0442\u0435 \u043f\u043e\u043b\u0443\u0447\u0438\u0442\u044c \u0438\u043d\u0434\u0438\u0432\u0438\u0434\u0443\u0430\u043b\u044c\u043d\u044b\u0435 \u0440\u0435\u0448\u0435\u043d\u0438\u044f \u0434\u043b\u044f \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440\u043e\u0432 \u0438\u043b\u0438 \u0440\u0435\u0430\u043a\u0442\u043e\u0440\u043e\u0432, \u043f\u043e\u0436\u0430\u043b\u0443\u0439\u0441\u0442\u0430, \u0441\u0432\u044f\u0436\u0438\u0442\u0435\u0441\u044c \u0441 \u043d\u0430\u043c\u0438.<br \/>\nWhatsApp: +86 13787095096<br \/>\n\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u043d\u043d\u0430\u044f \u043f\u043e\u0447\u0442\u0430: marketing@hnlsdz.com<\/p>","protected":false},"excerpt":{"rendered":"<p>Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown? For transformer and reactor maintenance engineers, performing regular Insulation Resistance Testing is a key part of preventive maintenance. It helps assess the health of the insulation between windings and ground, predicting potential faults. However, a common and dangerous mistake is testing immediately after shutdown. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7299,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-7296","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faq"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown<\/title>\n<meta name=\"description\" content=\"Testing insulation resistance immediately after shutdown is unsafe and inaccurate. Large transformers retain capacitive charge\u2014discharge typically takes 2\u20133 minutes with repeated shorting to confirm no residual charge\u2014and oil\/winding temperatures need about 30 minutes to equalize before measurement. After the test itself, the insulation has stored energy; the safety rule is to discharge for at least five times the charging time. This guide covers the sequencing and the physics behind each wait.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lstransformer.com\/ru\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/\" \/>\n<meta property=\"og:locale\" content=\"ru_RU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown\" \/>\n<meta property=\"og:description\" content=\"Testing insulation resistance immediately after shutdown is unsafe and inaccurate. Large transformers retain capacitive charge\u2014discharge typically takes 2\u20133 minutes with repeated shorting to confirm no residual charge\u2014and oil\/winding temperatures need about 30 minutes to equalize before measurement. After the test itself, the insulation has stored energy; the safety rule is to discharge for at least five times the charging time. This guide covers the sequencing and the physics behind each wait.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lstransformer.com\/ru\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/\" \/>\n<meta property=\"og:site_name\" content=\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-05T06:40:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"644\" \/>\n\t<meta property=\"og:image:height\" content=\"481\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"xiangligougou\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c\" \/>\n\t<meta name=\"twitter:data1\" content=\"xiangligougou\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 \u043c\u0438\u043d\u0443\u0442\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/\"},\"author\":{\"name\":\"xiangligougou\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/4aa28de58bbcbc630401c966317223d3\"},\"headline\":\"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown?\",\"datePublished\":\"2026-11-05T06:40:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/\"},\"wordCount\":832,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg\",\"articleSection\":[\"FAQ\"],\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/\",\"name\":\"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg\",\"datePublished\":\"2026-11-05T06:40:24+00:00\",\"description\":\"Testing insulation resistance immediately after shutdown is unsafe and inaccurate. Large transformers retain capacitive charge\u2014discharge typically takes 2\u20133 minutes with repeated shorting to confirm no residual charge\u2014and oil\\\/winding temperatures need about 30 minutes to equalize before measurement. After the test itself, the insulation has stored energy; the safety rule is to discharge for at least five times the charging time. This guide covers the sequencing and the physics behind each wait.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/#breadcrumb\"},\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg\",\"width\":644,\"height\":481},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.lstransformer.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#website\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.lstransformer.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ru-RU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#organization\",\"name\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"contentUrl\":\"https:\\\/\\\/www.lstransformer.com\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp\",\"width\":760,\"height\":202,\"caption\":\"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD\"},\"image\":{\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.lstransformer.com\\\/#\\\/schema\\\/person\\\/4aa28de58bbcbc630401c966317223d3\",\"name\":\"xiangligougou\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9cd84f27b57f8e0da2e8f59e38e2e665ad012e9ffc89a7182019a98e9590337b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9cd84f27b57f8e0da2e8f59e38e2e665ad012e9ffc89a7182019a98e9590337b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9cd84f27b57f8e0da2e8f59e38e2e665ad012e9ffc89a7182019a98e9590337b?s=96&d=mm&r=g\",\"caption\":\"xiangligougou\"},\"sameAs\":[\"https:\\\/\\\/lstransformer.com\"],\"url\":\"https:\\\/\\\/www.lstransformer.com\\\/ru\\\/author\\\/xiangligougou\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown","description":"Testing insulation resistance immediately after shutdown is unsafe and inaccurate. Large transformers retain capacitive charge\u2014discharge typically takes 2\u20133 minutes with repeated shorting to confirm no residual charge\u2014and oil\/winding temperatures need about 30 minutes to equalize before measurement. After the test itself, the insulation has stored energy; the safety rule is to discharge for at least five times the charging time. This guide covers the sequencing and the physics behind each wait.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lstransformer.com\/ru\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/","og_locale":"ru_RU","og_type":"article","og_title":"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown","og_description":"Testing insulation resistance immediately after shutdown is unsafe and inaccurate. Large transformers retain capacitive charge\u2014discharge typically takes 2\u20133 minutes with repeated shorting to confirm no residual charge\u2014and oil\/winding temperatures need about 30 minutes to equalize before measurement. After the test itself, the insulation has stored energy; the safety rule is to discharge for at least five times the charging time. This guide covers the sequencing and the physics behind each wait.","og_url":"https:\/\/www.lstransformer.com\/ru\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/","og_site_name":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD","article_published_time":"2026-11-05T06:40:24+00:00","og_image":[{"width":644,"height":481,"url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg","type":"image\/jpeg"}],"author":"xiangligougou","twitter_card":"summary_large_image","twitter_misc":{"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c":"xiangligougou","\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f":"6 \u043c\u0438\u043d\u0443\u0442"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/#article","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/"},"author":{"name":"xiangligougou","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/4aa28de58bbcbc630401c966317223d3"},"headline":"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown?","datePublished":"2026-11-05T06:40:24+00:00","mainEntityOfPage":{"@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/"},"wordCount":832,"commentCount":0,"publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"image":{"@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg","articleSection":["FAQ"],"inLanguage":"ru-RU","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/","url":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/","name":"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown? - LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown","isPartOf":{"@id":"https:\/\/www.lstransformer.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/#primaryimage"},"image":{"@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg","datePublished":"2026-11-05T06:40:24+00:00","description":"Testing insulation resistance immediately after shutdown is unsafe and inaccurate. Large transformers retain capacitive charge\u2014discharge typically takes 2\u20133 minutes with repeated shorting to confirm no residual charge\u2014and oil\/winding temperatures need about 30 minutes to equalize before measurement. After the test itself, the insulation has stored energy; the safety rule is to discharge for at least five times the charging time. This guide covers the sequencing and the physics behind each wait.","breadcrumb":{"@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/#breadcrumb"},"inLanguage":"ru-RU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/"]}]},{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/#primaryimage","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/10\/\u53d8\u538b\u56684\uff08\u6d77\u5916\uff09.jpg","width":644,"height":481},{"@type":"BreadcrumbList","@id":"https:\/\/www.lstransformer.com\/why-you-should-never-test-insulation-resistance-immediately-after-transformer-shutdown\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.lstransformer.com\/"},{"@type":"ListItem","position":2,"name":"Why You Should Never Test Insulation Resistance Immediately After Transformer Shutdown?"}]},{"@type":"WebSite","@id":"https:\/\/www.lstransformer.com\/#website","url":"https:\/\/www.lstransformer.com\/","name":"\u0421\u0438\u043b\u043e\u0432\u043e\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440 LS, \u041b\u0438\u043d\u0435\u0439\u043d\u044b\u0439 \u0440\u0435\u0430\u043a\u0442\u043e\u0440, \u0412\u044b\u0441\u043e\u043a\u043e\u0432\u043e\u043b\u044c\u0442\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440, \u041c\u0430\u0441\u043b\u043e\u043d\u0430\u043f\u043e\u043b\u043d\u0435\u043d\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO., LTD","description":"","publisher":{"@id":"https:\/\/www.lstransformer.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lstransformer.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ru-RU"},{"@type":"Organization","@id":"https:\/\/www.lstransformer.com\/#organization","name":"\u0421\u0438\u043b\u043e\u0432\u043e\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440 LS, \u041b\u0438\u043d\u0435\u0439\u043d\u044b\u0439 \u0440\u0435\u0430\u043a\u0442\u043e\u0440, \u0412\u044b\u0441\u043e\u043a\u043e\u0432\u043e\u043b\u044c\u0442\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440, \u041c\u0430\u0441\u043b\u043e\u043d\u0430\u043f\u043e\u043b\u043d\u0435\u043d\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO., LTD","url":"https:\/\/www.lstransformer.com\/","logo":{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","contentUrl":"https:\/\/www.lstransformer.com\/wp-content\/uploads\/2026\/06\/cropped-7e09bd7bad9c830e0d75b8487b0d77c3-1.webp","width":760,"height":202,"caption":"LS power transformer, Line reactor, High-voltage transformer, Oil-immersed transformer-CHANGSHA LUSHAN ELECTRONIC TECHNOLOGY CO.,LTD"},"image":{"@id":"https:\/\/www.lstransformer.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.lstransformer.com\/#\/schema\/person\/4aa28de58bbcbc630401c966317223d3","name":"\u0441\u044f\u043d\u043b\u0438\u0433\u0443\u0433\u043e\u0443","image":{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/secure.gravatar.com\/avatar\/9cd84f27b57f8e0da2e8f59e38e2e665ad012e9ffc89a7182019a98e9590337b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9cd84f27b57f8e0da2e8f59e38e2e665ad012e9ffc89a7182019a98e9590337b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9cd84f27b57f8e0da2e8f59e38e2e665ad012e9ffc89a7182019a98e9590337b?s=96&d=mm&r=g","caption":"xiangligougou"},"sameAs":["https:\/\/lstransformer.com"],"url":"https:\/\/www.lstransformer.com\/ru\/author\/xiangligougou\/"}]}},"_links":{"self":[{"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/posts\/7296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/comments?post=7296"}],"version-history":[{"count":2,"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/posts\/7296\/revisions"}],"predecessor-version":[{"id":7301,"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/posts\/7296\/revisions\/7301"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/media\/7299"}],"wp:attachment":[{"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/media?parent=7296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/categories?post=7296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lstransformer.com\/ru\/wp-json\/wp\/v2\/tags?post=7296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}