How is the understanding of withstand voltage and test voltage?

ホーム > FAQ > How is the understanding of withstand voltage and test voltage?

How is the understanding of withstand voltage and test voltage?

微信分享

请复制下面链接,在微信内打开分享
https://www.lstransformer.com/ja/how-is-the-understanding-of-withstand-voltage-and-test-voltage/

How is the understanding of withstand voltage and test voltage?

In practical operation, transformers and choke coils are exposed to transient overvoltages due to various reasons.

コンテンツ

1. Illustrate

For instance, when a transformer’s power supply is closed, it may generate a transient overvoltage twice the normal operating voltage. Similarly, when the power supply is disconnected, it can produce a transient overvoltage 8 to 10 times the normal operating voltage. Sudden open or short circuits in the load can result in extremely high transient overvoltages, and lightning can induce transient overvoltages of up to 3000 volts. The connection and disconnection of thousands of electrical devices on the same power grid may also cause mutual interference and transient overvoltages.

Additionally, due to distributed capacitance between layers, groups, turns, and coils with the core of transformers and choke coils, the distribution of transient overvoltages is uneven, with the first and last few turns and layers of the coil typically experiencing the maximum transient overvoltage. As a result, transformers and choke coils are constantly exposed to the impact of transient overvoltages during operation.

未定義

2. Electrical strength & test voltage

Although the insulation design of transformers and choke coils incorporates a significant safety margin, to ensure their long-term, safe, and reliable operation in practical settings, it is necessary to subject them to a withstand voltage test using an externally applied voltage several times higher than the normal working voltage of the product. This test is designed to evaluate the insulation system’s ability to withstand transient overvoltages and to check for potential defects. In the withstand voltage test, the externally applied voltage is referred to as the test voltage. Typically, when the working voltage is below 110 volts, the test voltage is twice the working voltage plus 500 volts. When the working voltage is above 110 volts, the test voltage is twice the working voltage plus 1000 volts. Since different electronic devices have varying operational conditions, the requirements for withstanding transient overvoltages may differ. Therefore, specific test specifications are often formulated based on the individual circumstances of each type of electronic device.

未定義

連絡先

廬山,est。 1975年には中国の専門職の専門メーカーの電力変圧器及び原子炉のための50+る。 主製品 単相トランス、三相絶縁変圧器、電気トランス、物流トランス、ステップの下、信用リスク以外のリスクにつきトランス、低電圧トランス、高電圧トランス、制御トランス、トロイダルトランス、Rコアトランス直流インダクター、AC炉では、フィルタリング炉、負荷炉chokes、フィルタリングの原子炉は、中間体、高周波製品.

当社の電力変圧器及び原子炉に広く使用されて10アプリケーション:高速鉄道、建設機械、再生可能エネルギー、ロボット、医療機器、炭鉱爆発の防止、励起システム、真空焼結(炉)、中央エアコンがあります。

知電源トランス原子炉: www.lstransformer.com.

希得のカスタマイズソリューションのためのトランスや原子炉、お問い合わせください。
WhatsApp:+86 13787095096
メール:marketing@hnlsdz.com

どうぞコメント

メールアドレスが公開されることはありません。 *が付いている欄は必須項目です※"

WhatsAppにQR WeChat QR sales@hnlsdz.com
スクロールトップ