Performing a pump test for oil-immersed transformers is an essential step in the production and maintenance processes. For transformers that have completed the assembly, especially those with a capacity of 8000kVA, voltage of 35kV and below, and equipped with an oil storage tank, a pump test must be carried out, as shown in Figure 87-1(a). For transformers with a capacity of 3150kVA, voltage of 60kV and above, the same method can be employed even after oil filling to ensure the quality during transportation and storage. During the pump test, the pump joint should be installed at the plug seat on top of the oil storage tank or at the dismantled box top flange, and the oil level position on the oil gauge should be recorded.

The procedure is as follows: Hold the windpipe with the left hand towards the pump nozzle and introduce dry compressed air; with the right hand, tighten the pressure gauge from the upper end of the pump joint, forcing a gap (i.e., opening the sealing surface) between the joint and the internal components, allowing gas to enter the pressure gauge and the inside of the oil storage tank. As the gas is injected into the tank, the oil level on the oil gauge will slowly decrease. When it drops to approximately 30-40mm, and the pressure gauge shows a pressure of 0.045MPa, rotate the pressure gauge upward to seal the internal components with the joint, completing the gas injection.

During the pump test, if there is a leakage of gas in the transformer, it can be observed from the oil gauge that the oil gradually returns to its position before the pump; if there is a oil leakage, the oil level will drop even lower. Within 8 hours after the pump test, the operator needs to repair the leaking oil and gas areas, and then apply pressure for an additional 4 hours (2 hours for dismantled products). Only when the pressure is not less than 0.02MPa and there is no leaking oil, the pump test is considered qualified.

が撤退し、ポンプ、オペレーターの左手にブロック、バルブをはずのシール面の圧力ゲージのチェックの残留圧力は以下0.02MPaまでのタイプもあります。 のポンプ試験方法においてシングル-ケーシングトランスで60kV、110kVついては、図87-2、ポンプの共同に接続しての圧力ゲージ、自転車のバルブが溶接に共同のためのインフレ圧縮空気やインフレです。

連絡先

廬山,est。 1975年には中国の専門職の専門メーカーの電力変圧器及び原子炉のための50+る。 主製品 単相トランス、三相絶縁変圧器、電気トランス、物流トランス、ステップの下、信用リスク以外のリスクにつきトランス、低電圧トランス、高電圧トランス、制御トランス、トロイダルトランス、Rコアトランス直流インダクター、AC炉では、フィルタリング炉、負荷炉chokes、フィルタリングの原子炉は、中間体、高周波製品.

当社の電力変圧器及び原子炉に広く使用されて10アプリケーション:高速鉄道、建設機械、再生可能エネルギー、ロボット、医療機器、炭鉱爆発の防止、励起システム、真空焼結(炉)、中央エアコンがあります。

知電源トランス原子炉: www.lstransformer.com.

希得のカスタマイズソリューションのためのトランスや原子炉、お問い合わせください。
WhatsApp:+86 13787095096
メール:marketing@hnlsdz.com

WhatsAppにQR WeChat QR sales@hnlsdz.com
スクロールトップ